INSP-Final Inspection | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | P | FAIL |
Troy Cobbley
|
|
|
Ceiling tile was not installed.
|
INSP-Final Inspection | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
Can not final until the ceiling tile has been installed. Piping can be covered.
|
Application received | | | 5/11/2011 | | |
|
|
|
|
Pending Assignment by SAM | 5/11/2011 | | 5/11/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Tim) | 5/11/2011 | | 5/11/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/11/2011 | | 5/11/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/11/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/11/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/11/2011 | | 5/11/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 5/11/2011 | | DONE |
|
|
|
t/c w jeff - permit ready and fees given
|
Permit Ready to Issue | | | 5/11/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/11/2011 | | DONE |
Barbara Stitt
|
|
|
|