Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00210
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 11311 W CHINDEN BLVD
Project NameHP BLD 7
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers in three areas. The existing system has telescoping branch piping and various main sizes. The sprinklers will be standard response since all areas are ordinary hazard.


Building Department Scope:

Remodel of an existing 8,000 sq. ft. floor area located in the SW quadrant of HP Building #7 for relocation of equipment testing facilities and testing chambers from other buildings in HP Complex and an addition of 288 sq. ft. extension of Package Test Lab 104. Work includes select demolition; concrete foundations for new addition, vibration equipment pit and lifting crane in PTL 104; new mechanical mezzanine and support structure; exterior exit door, landing, stairs and railings; relocated doors and new walls to create Life Test #1, Life Test #2 and NN Room; suspended ceiling grid system in remodeled areas; lighting fixtures, controls, interior finishes; modification of HVAC, electrical, plumbing, fire sprinkler and alarm systems. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  12/16/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection10/24/201110/24/201110/24/2011PPASS
DetailsForrest France
Scope of fire sprinkler permit work okay for final.
INSP-Sprinkler Rough-in10/24/201110/24/201110/24/2011PPART
DetailsForrest France
Fire sprinkler install okayed for cover.
INSP-Final Inspection10/12/201110/13/201110/13/2011ACANC
DetailsTroy Cobbley
There was no supporting documentation for approval to cover in the packaging area. Troy and I agreed to waite until next week to have the fire inspector that did the original inspection perform a re-inspection. If not, ceiling tile needs to come back out.
INSP-Final Inspection10/7/201110/10/201110/10/2011PCANC
DetailsTroy Cobbley
Please call Jeremy with time frame. ###-####. Thanks >> Inspection requested via web by Jeff Packham
Override - Parcel Holds  8/24/2011  
Override - Parcel Holds  8/24/2011  
Issue and Print Permit  8/24/2011 DONE
Plan assigned to (Tim)5/13/2011 8/23/2011 DONE
DetailsTim Frost
Sprinkler Plan Check8/23/2011 8/23/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  8/23/2011 DONE
DetailsTim Frost
Override - Parcel Holds  8/23/2011  
Override - Parcel Holds  8/23/2011  
Inspection Record Card- Fire8/23/2011 8/23/2011 DONE
DetailsPatricia Smith
Telephone call  8/23/2011 DONE
t/c w brodie - permit ready and fees given
Override - Parcel Holds  8/23/2011  
Override - Parcel Holds  8/23/2011  
Permit Ready to Issue  8/23/2011 DONE
Details
Plan resubmittals received  8/18/2011  
DetailsTim Frost
Case Summary  8/18/2011 DONE
DetailsBarbara Stitt
Sprinkler Plan Check5/16/2011 5/16/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  5/16/2011 DONE
DetailsTim Frost
Miscellaneous action  5/16/2011 DONE
Emailed review to contractor
Telephone call  5/16/2011 DONE
t/c w brodie - permit denied - needs to be picked up and resubmitted
Application received  5/13/2011