Miscellaneous action | | | 7/7/2011 | | DONE |
|
|
|
Asbuilt drawings recieved and stamped approved on site by T. Cobbley
|
INSP-Final Inspection | 7/6/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Revised drawings to be provided showing the wall and candella changes.
|
INSP-Final Inspection | 7/5/2011 | 7/5/2011 | 7/6/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints.
|
1st review completed | | | 5/27/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 5/27/2011 | | 5/27/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved per field review by T Cobbley
|
PLANS TAKEN FRONT DESK ALARM | | | 5/27/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 5/27/2011 | | DONE |
|
|
|
|
Application received | | | 5/26/2011 | | DONE |
Mary Froemke
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 5/26/2011 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|