Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2011 | 9/22/2011 | 9/22/2011 | P | PASS |
Troy Cobbley
|
|
|
hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/14/2011 | 9/14/2011 | 9/14/2011 | P | CANC |
Troy Cobbley
|
|
|
overbooked
|
INSP-Sprinkler Rough-in/Hydro | 9/13/2011 | 9/13/2011 | 9/13/2011 | P | FAIL |
Troy Cobbley
|
|
|
Above ground hydro test failed
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PART |
Troy Cobbley
|
|
|
Piping in the office area can be covered except in all of the areas marked in red as discussed due to missing seismic bracing.
|
INSP-Sprinkler Rough-in | 9/9/2011 | 9/9/2011 | 9/9/2011 | P | CANC |
Forrest France
|
|
|
Overbooked
|
Issue and Print Permit | | | 6/6/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/27/2011 | | 6/3/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/3/2011 | | 6/3/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/3/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/3/2011 | | 6/3/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/3/2011 | | DONE |
|
|
|
left vm for jeff - permit ready and fees given
|
Permit Ready to Issue | | | 6/3/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/2/2011 | | |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 6/1/2011 | | 6/1/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/1/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 6/1/2011 | | DONE |
|
|
|
t/c w jeff - permit denied - needs to be picked up and resubmitted
|
Application received | | | 5/27/2011 | | |
|
|
|
|