Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR11-00257
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron 24D / 24E First Floor
Customer NumberC15141
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of removing and adding sprinklers to accommodate new wall and ceiling configuration. The modifications are supplied from two systems. A wall at column lines 31 and 32 divides the systems. The piping has telescoping branch piping with 4” and 6” main.

Drawings FP2.1.1 and FP2.1.2 shows the new piping arrangement. The remainders of the drawings are redundant showing demolition and hydraulic reference points.

Plan Mod #1
Changed one branch line from 2” to 1½” during installation. See sheet FP2.1.6 Rev 2

Plan Mod #2
3/12/2012 Changed size of cross-main on sheet FP2.1.4 between nodes F1-F2-F3 to 4”

Building Department Scope:

Micron Buildings 24D & 24E - (C15141) - Remodel For Clean and Dirty Links - To convert approximately 1,900 sq. ft. of clean link, dirty corridor, and dock space in Building 24D into a clean link to future Building 50. Install new clean room ceiling grid with HEPAS to prepare for installation of AMHS extension to Building 50. Remodel approximately 1,200 sq. ft. of Lab space in Building 24E to accommodate a new dirty corridor to Building 50. Install new catwalks in the interstitial spaces of Buildings 24D & 24E to accommodate facility routing in the area. This work is being done on the first floor of Buildings 24D & 24E between grid lines A&F and 30&33. This permit also includes related electrical and mechanical work. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/11/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection7/18/20127/19/20127/23/2012PPASS
DetailsForrest France
Permit finaled.
FIR-Aging Inspection7/5/20127/5/20127/5/2012 DONE
DetailsForrest France
Plan assigned to (Tim)6/22/2012 6/29/2012 DONE
DetailsTim Frost
Sprinkler Plan Check6/29/2012 6/29/2012 PASS
DetailsTim Frost
1st review completed  6/29/2012 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/29/2012 DONE
DetailsTim Frost
Permit Ready to Issue  6/29/2012 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  6/29/2012 DONE
DetailsTisha Gallop
picked up plan mod
Plan resubmittals received  6/22/2012  
CHANGE STATUS TO (ISS)  3/29/2012 DONE
DetailsBarbara Stitt
(F) Reprint permit  3/29/2012 DONE
Plan assigned to (Tim)3/5/2012 3/12/2012 DONE
DetailsTim Frost
Plan Modification
Sprinkler Plan Check3/12/2012 3/12/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  3/12/2012 DONE
DetailsTim Frost
Permit Ready to Issue  3/12/2012 DONE
DetailsBarbara Stitt
Telephone call  3/12/2012 DONE
DetailsBarbara Stitt
Emailed Paul that permit is ready & fees on 3-12-12 @ 1:40pm///BAS
Inspection Record Card- Fire3/12/2012 3/12/2012 DONE
DetailsBarbara Stitt
Plan resubmittals received  3/9/2012  
Received three copies of plans FP211, FP212, FP216 & FP217
Plan resubmittals received  3/5/2012  
Received 3 copies of fire sprikler application, 3 copies of hydraulic design information, 3 copies of sheets FP2.1.3, FP2.1.4, FP2.1.5
INSP-Final Inspection2/16/20122/17/20122/17/2012APART
DetailsForrest France
Completed walkthrough at cleanroom link for spacing and location of new pendent heads.
(F) Reprint permit  2/16/2012  
Inspection Record Card- Fire2/16/2012 2/16/2012 DONE
DetailsBarbara Stitt
Permit Ready to Issue  2/16/2012 DONE
DetailsBarbara Stitt
Telephone call  2/16/2012 DONE
DetailsBarbara Stitt
Emailed Paul that permit is ready and fees due on 2-16-12 @ 8:30am//BAS
Issue and Print Permit  2/16/2012 DONE
DetailsBarbara Stitt
Sprinkler Plan Check2/15/2012 2/15/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  2/15/2012 DONE
DetailsTim Frost
Plan resubmittals received  2/13/2012  
2-13-12 received 1 hydraulic design information sheet and 2 copies of sheet fp 2.1.6 sent to Tim F.
INSP-Sprinkler Rough-in/Hydro9/23/20119/27/20119/28/2011PPART
DetailsForrest France
Partial for hydrostatic testing of two branchlines prior to system tie-in.
Plan assigned to (Tim)7/21/2011 7/28/2011 DONE
DetailsTim Frost
Sprinkler Plan Check7/28/2011 7/28/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/28/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/28/2011 DONE
DetailsTim Frost
Telephone call  7/28/2011 DONE
t/c w collin - permit ready
Permit Ready to Issue  7/28/2011 DONE
Details
Issue and Print Permit  7/28/2011 DONE
Plan assigned to (Scott)  6/2/2011 DONE
DetailsBill Alexander
This permit was created on the web by Paul Marcolina
Application received  6/2/2011 DONE
This permit was created on the web by Paul Marcolina