INSP-Final Inspection | 6/15/2011 | 6/17/2011 | 6/17/2011 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work completed acceptable. Permit finaled.
|
INSP-Conference | 6/15/2011 | 6/15/2011 | 6/15/2011 | P | DONE |
Forrest France
|
|
|
Conversation with contractor regarding sprinkler monitoring requirements and site inspection schedule.
|
Plan assigned to (Tim) | 6/7/2011 | | 6/8/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/8/2011 | | 6/8/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/8/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/8/2011 | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told that permit is ready & fees due on 6-8-11 @ 9:05am//BAS
|
Issue and Print Permit | | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 6/7/2011 | | |
|
|
|
|