Miscellaneous action | | | 9/2/2011 | | DONE |
|
|
|
Taken to records for scanning.
|
INSP-Final Inspection | 8/31/2011 | 9/1/2011 | 9/1/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Miscellaneous action | | | 9/1/2011 | | DONE |
|
|
|
As-built drawings received.
|
INSP-Final Inspection | 8/29/2011 | 8/30/2011 | 8/30/2011 | A | FAIL |
Troy Cobbley
|
|
|
As-builts have not been provided and an additional a/v is required in the fabric meeting room. End of line boltage calculations will need to be verified. Spacing was verified and two strobes adjusted on site. The devices have not been set off and tested for sync. yet.
|
INSP-Sprinkler Rough-in | 8/16/2011 | 8/18/2011 | 8/18/2011 | A | CANC |
Forrest France
|
|
|
Overbooked.
|
Issue and Print Permit | | | 7/18/2011 | | DONE |
|
|
|
|
1st review completed | | | 6/15/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 6/15/2011 | | 6/15/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 6/15/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 6/15/2011 | | 6/15/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/15/2011 | | DONE |
|
|
|
t/c w michael - permit ready and fees given
|
Permit Ready to Issue | | | 6/15/2011 | | DONE |
|
|
|
|
Application received | | | 6/10/2011 | | |
|
|
|
|
Case Summary | | | 6/10/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 6/10/2011 | | 6/10/2011 | | DONE |
Darla L Downs
|
|
|
|