Miscellaneous action | | | 9/22/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 9/6/2011 | 9/6/2011 | 9/6/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | PASS |
Troy Cobbley
|
|
|
The underground supply piping hydro test passed.
|
INSP-Sprinkler Rough-in | 7/29/2011 | 7/29/2011 | 8/1/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
INSP-Sprinkler Rough-in | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | NR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 7/27/2011 | 7/27/2011 | 7/27/2011 | P | PART |
Forrest France
|
|
|
See stamped plan set for dated red lines indicating location of work completed and approved for bury.
|
INSP-Sprinkler Rough-in | 7/25/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Troy Cobbley
|
|
|
Underground piping is ok to cover 60' from the first 22 degree fitting towards the building.
|
INSP-Sprinkler Rough-in | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Troy Cobbley
|
|
|
Underground is ok to cover up to the 22 degree fitting
|
INSP-Sprinkler Rough-in | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | FAIL |
Troy Cobbley
|
|
|
Arrived at job site but found that the piping installation of the underground is being delayed due to problems with other services. Troy said he would reschedule for tomorrow.
|
CHANGE STATUS TO (ISS) | | | 7/22/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/20/2011 | | 7/21/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/21/2011 | | 7/21/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/21/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/21/2011 | | 7/21/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/21/2011 | | DONE |
|
|
|
left message - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 7/21/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/20/2011 | | DONE |
|
|
|
received 3 sets of plan mods sent to Tim Frost
|
Pending Assignment by SAM | 6/10/2011 | | 7/20/2011 | | DONE |
Darla L Downs
|
|
|
|
INSP-Sprinkler Rough-in | 6/14/2011 | 6/15/2011 | 6/15/2011 | A | PASS |
Troy Cobbley
|
|
|
The stub out only is ok to cover. This piping was lowered to meet the city and state requirement of atleast 4'6" to top of piping for a minimum bury.
|
Sprinkler Plan Check | 6/14/2011 | | 6/14/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/14/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/14/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 6/14/2011 | | 6/14/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/14/2011 | | DONE |
|
|
|
t/c w greg - permit ready and fees given
|
Permit Ready to Issue | | | 6/14/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 6/14/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 6/10/2011 | | |
|
|
|
|
Case Summary | | | 6/10/2011 | | DONE |
Barbara Stitt
|
|
|
|