Permit Information
Permit NumberFIR11-00308
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 3300 S SHOSHONE ST
Project NameFairfield Inn
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding zone control valves to each floor. Providing all new galvanized piping for the attic system. Since all of the piping is being replaced in the attic; it is being treated as if it was a new system. Replace corroded sprinklers in the pool and vestibule areas. Adding remote inspector test connections. It appears, the original system was installed in 1994 by Safety First Fire Systems. The plans are microfiche under 970691.


Building Department Scope:

There is no associated building permit since the project only deals with fire sprinkler modifications and repairs.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/22/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection9/6/20119/7/20119/7/2011APASS
DetailsForrest France
Fire sprinkler permit work passed final inspection.
INSP-Final Inspection9/2/20119/2/20119/2/2011PFAIL
DetailsForrest France
Final pending repair of three non-functional waterflow switches at the new riser manifold.
INSP-Sprinkler Rough-in/Hydro8/12/20118/12/20118/12/2011PPART
DetailsForrest France
Hydrostatic testing passed for the new wet system manifolds and piping.
INSP-Sprinkler Rough-in/Hydro8/12/20118/12/20118/12/2011APART
DetailsForrest France
Overhead rough-in for the new dry system completed. Noted items include; replace three BB1 attic heads due to modified deflector/frame orientation, one upright head at the NE dormer is obstructed by truss webs, one EQ brace secured while on site.
INSP-Sprinkler Rough-in/Hydro8/10/20118/11/20118/12/2011APART
DetailsForrest France
Completed satisfactory 24 hr. air test of the new dry system piping.
INSP-Final Inspection8/9/20118/10/20118/10/2011APART
DetailsForrest France
Begin 24 hr. air test of the new dry system piping at 11:30 AM @44.5psig.
INSP-Sprinkler Rough-in/Hydro8/8/20118/9/20118/9/2011APART
DetailsForrest France
Overhead hydrostatic testing for the new dry system piping passed. Discussed schedule for pneumatic test.
Plan assigned to (Tim)6/29/2011 7/11/2011 DONE
DetailsTim Frost
Sprinkler Plan Check7/11/2011 7/11/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/11/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire7/11/2011 7/11/2011 DONE
DetailsPatricia Smith
Telephone call  7/11/2011 DONE
t/c w melissa - permit ready and fees given
Permit Ready to Issue  7/11/2011 DONE
Details
Issue and Print Permit  7/11/2011 DONE
Plan resubmittals received  7/8/2011 DONE
DetailsChristina Prado
Received 4 new sets of applications, checklists, calcs and plan sheet 1 of 1. Routed to Tim Frost for additional review
Sprinkler Plan Check6/30/2011 6/30/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/30/2011 DONE
DetailsTim Frost
Miscellaneous action  6/30/2011 DONE
Emailed Contractor Reivew.
Telephone call  6/30/2011 DONE
t/c w brett - permit denied - needs to be picked up and resubmitted
Application received  6/29/2011