Permit Information
Permit NumberFIR11-00309
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly High School
Customer Number 
ePlanReviewNo
Description
8/16/11 PLAN MODIFICATION (1 initiating device affected): This plan modification is to modify the scope of work to include building a temporary 'house' for the existing FACP, NAC1, and VOIC1 panels; add a smoke detector above the panel, maintain detectors that were to be demo'd under the original scope of work, and delete some notification devices as shown on the plans. 6/30/11:This quick permit is to show the demolition of devices located in an area of the building that is to be demo'd and eventually remodeled. A separate permit shall be required to include new device locations for the remodeled areas. There are no written review comments. Associated building permit: BLD11-00836 Bishop Kelly High School - Administration and Main Entry Remodel and Addition - To demolish and remove approximately 7,100 square feet of existing building that contains administrative offices and a storage garage area. To reconstructed that portion of the building to contain reconfigured administrative offices and accessible restrooms and to constructed a 5,375 square foot addition that will contain a new main entry, lobby/study area, waiting area, new student commons and new mens and womens accessible restrooms. This permit also includes the construction of a new exterior entry plaza and other associate site improvements. This addition and remodel is being done on the northwest side of the high school. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/2/2011 DONE
Taken to records for scanning.
Miscellaneous action  9/2/2011 DONE
Taken to records for scanning.
INSP-Final Inspection8/17/20118/17/20118/17/2011PPASS
DetailsTroy Cobbley
Permit finaled
Alarm Plan Check8/16/2011 8/16/2011 PASS
DetailsStephanie L. Cobbley
Plan modification of the quick permit approved.
PLANS TAKEN FRONT DESK ALARM  8/16/2011 DONE
Approved plan modification documents available at front counter.
Inspection Record Card- Fire8/16/2011 8/16/2011 DONE
DetailsPatricia Smith
Telephone call  8/16/2011 DONE
t/c w dante - permit (plan mod) ready and fees given
Permit Ready to Issue  8/16/2011 DONE
Details
CHANGE STATUS TO (ISS)  8/16/2011 DONE
Plan resubmittals received  8/15/2011 DONE
Plan assigned to (Stephanie)8/15/2011 8/15/2011 DONE
DetailsStephanie L. Cobbley
Telephone call  8/10/2011 DONE
Spoke with the project architect, Richard Honsinger. I communicated to Richard the Fire Departments concern regarding the current condition and progress toward completion of the required building Fire Protection systems. I informed Richard that the Fire Protection systems serving all occupied portions of the existing building must be installed, inspected, and fully operational before continued occupancy of the building. At this time, no applications for Fire Protection permits, pertaining to the reconnecting of the related alarm components etc, has been submitted to the Planning and Development Services Department. A meeting has been scheduled for 8/11/11 onsite between the Fire Marshal, PDS/Fire manager, PDS/Fire field inspector, General contractor and Architect.
Issue and Print Permit  7/6/2011 DONE
DetailsBarbara Stitt
Plan assigned to (Stephanie)6/29/2011 6/30/2011 DONE
DetailsStephanie L. Cobbley
Plan assigned to (Stephanie)6/29/2011 6/30/2011 DONE
DetailsStephanie L. Cobbley
1st review completed  6/30/2011 DONE
Alarm Plan Check6/30/2011 6/30/2011 PASS
DetailsStephanie L. Cobbley
Quick permit approved - no written review comments.
PLANS TAKEN FRONT DESK ALARM  6/30/2011 DONE
Approved quick permit plans available at front counter.
Inspection Record Card- Fire6/30/2011 6/30/2011 DONE
DetailsPatricia Smith
Telephone call  6/30/2011 DONE
left vm for dante - permit ready and fees given
Permit Ready to Issue  6/30/2011 DONE
Details
Application received  6/29/2011