Miscellaneous action | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/15/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 12/1/2011 | 12/2/2011 | 12/2/2011 | A | CANC |
Troy Cobbley
|
|
|
Call Doug Funk at above # 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Supply line flush | 9/28/2011 | 9/29/2011 | 9/29/2011 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed. One pendant needs to be relocated in the corridor. Also the bathroom plan shows a door separating the shower from the remaining restroom. If this separation is not installed the combined space will exceed 50 sq. ft and will require sprinkler protection.
|
INSP-Sprinkler Rough-in | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover.
|
Issue and Print Permit | | | 7/18/2011 | | |
|
|
|
|
Plan assigned to (Tim) | 7/13/2011 | | 7/15/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/15/2011 | | 7/15/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/15/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2011 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 7/15/2011 | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 7/15/2011 | | DONE |
Barbara Stitt
|
|
|
Called Sam and told him that permit is ready & fees due on 7-15-11 @ 10:30am
|
Application received | | | 7/13/2011 | | |
|
|
|
|