Miscellaneous action | | | 9/22/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 7/21/2011 | 7/22/2011 | 7/22/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Telephone call | | | 7/22/2011 | | DONE |
|
|
|
Spoke with Brodie at TVFP he indicated that the connect to the main was approximately 12' farther down the 2 1/2" pipe. Due to the amount of cushion left in the system I told him that was acceptable without resubmittal.
|
Plan resubmittals received | | | 7/22/2011 | | DONE |
Christina Prado
|
|
|
Received transmittal letter and two as-built plans marked FP-1. Gave to Tim Frost for review
|
Plan assigned to (Tim) | 7/14/2011 | | 7/20/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/20/2011 | | 7/20/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/20/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/20/2011 | | 7/20/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/20/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 7/20/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/20/2011 | | DONE |
|
|
|
|
Application received | | | 7/14/2011 | | |
Barbara Stitt
|
|
|
|