Miscellaneous action | | | 10/13/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 10/5/2011 | 10/6/2011 | 10/6/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
Issue and Print Permit | | | 8/17/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 7/19/2011 | | 7/29/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 7/29/2011 | | 7/29/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 7/29/2011 | | DONE |
|
|
|
Approved plans available at front counter.
|
Inspection Record Card- Fire | 7/29/2011 | | 7/29/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 7/29/2011 | | DONE |
|
|
|
left vm - permit ready and fees given
|
Permit Ready to Issue | | | 7/29/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/28/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of application, submittal small docs and plans; routed to Fire Review.
|
Telephone call | | | 7/26/2011 | | DONE |
|
|
|
Spoke to Rick at Northwest Fire & Security to let him know I would need to deny the plans. The permit application indicated Dave Maxwell (factory trained) as the designer, however the building plans (BLD11-00885) have engineered fire alarm drawings stamped by Robert A. Moulder. I explained to Rick that the plans would need to go to Mr. Moulder for him to review and either stamp or sign a letter indicating he's reviewed them and they meet his design intent. I let him know the plans (both sets since I can't review them) would be available at the front counter for him to pick up.
|
1st review completed | | | 7/26/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 7/26/2011 | | 7/26/2011 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - need the engineer of record (was not listed on the permit application) to review the drawings prior to City review.
|
Miscellaneous action | | | 7/26/2011 | | DONE |
|
|
|
denied plans (two sets) taken to front counter for contractor to pick up
|
Miscellaneous action | | | 7/26/2011 | | DONE |
Tisha Gallop
|
|
|
contractor picked up denied plans
|
Application received | | | 7/19/2011 | | |
|
|
|
|