INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 | P | FAIL |
Troy Cobbley
|
|
|
The hood suppression system operated correctly. But all of the correct sign off paper work had not been provided and the appliance layout for the large hood did not match the paper work.
|
INSP-Final Inspection | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | CANC |
Troy Cobbley
|
|
|
aaron Phone #: ###-####--Cancel by SHelby @ 12:05pm
|
Meeting | | | 7/20/2011 | | DONE |
Tisha Gallop
|
|
|
Meeting with Jim Daines w/American Fire Protection. Per Scott A. need to have seperate FIR permit for second system at this location, no double fee assessed.
|
Application received | | | 7/19/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 7/19/2011 | | |
|
|
|
|
Issue and Print Permit | | | 7/19/2011 | | DONE |
|
|
|
|