Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00365
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 8000 S FEDERAL WAY
Project NameB50-R&D EXPANSION BLD
Customer NumberC15044
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of providing protection in the Sub System 8 Mechanical. The system is a side feed with a 4” main and 2” branch lines. There are additional sprinklers below ductwork. There are also sprinklers within the fiberglass ductwork.

Note: See permit FIR11-00301 for the review on other portions of System 8

Plan Mod #1
Added protection for a corridor (clean link). Totally, revised layout for the Subfab – System 8 Mech Duct (Sheet FP5). Revised layout for vestibule 002B (Sheet FP4)

This review is for changes ballooned in conjunction with plan mod #1 ONLY. Please, see original previous review for ALL other areas.


Building Department Scope:

Micron Building B50 - R&D Building - To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. (60,100 sq. ft. finished and 29,325 sq. ft. unfinished). The second floor is a 21,570 sq. ft. mechanical space (16,170 sq. ft. used and 5,400 square feet future). The basement level (subfab.) has 43,295 sq. ft. finished and 28,560 unfinished. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection10/25/201210/25/201210/30/2012PPASS
DetailsForrest France
INSP-Final Inspection10/22/201210/22/201210/30/2012PPART
DetailsForrest France
Verify conditions per IFC 1803.10.4.
INSP-Final Inspection10/17/201210/19/201210/30/2012APART
DetailsForrest France
Re-inspection for noted C/N items
FIR-Aging Inspection7/3/20127/3/20127/3/2012 DONE
DetailsForrest France
INSP-Sprinkler Rough-in4/2/20124/3/20124/4/2012PPART
DetailsForrest France
Plan modification pending.
INSP-Sprinkler Rough-in/Hydro3/30/20124/2/20124/2/2012PPART
DetailsForrest France
Overhead hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro3/29/20123/30/20123/30/2012PNR
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012AFAIL
DetailsForrest France
System 8 hydrostatic test failed due to pressure loss at the gauge.
INSP-Sprinkler Rough-in/Hydro2/27/20122/27/20123/1/2012PPART
DetailsForrest France
See re-inspection notes listed under project related permit FIR11-00301.
INSP-Sprinkler Rough-in1/18/20121/19/20121/20/2012AFAIL
DetailsForrest France
Rough-in inspection for system 8 sub-fab mechanical continued. Field inspection concluded prior to a complete review due to the high number of deficiencies noted which include; spacing at upright heads up to 150ft2, one sprinkler inside a sheetrock wall, upright sprinkler deflectors throughout at the deck level are not in compliance with location criteria per NFPA 13 8.6.4.1.2, missing and overspaced coverage at the end of the sub-floor link branch line, missing retainers at several beam clamps for hangers on the 3" main to the in duct sprinklers, noted sprigs at one branch line out of axis, areas below ducts over 4' at some locations are unprotected or overspaced, coverage at all areas needs to meet obstruction guidelines per NFPA 13 8.6.5.2 and 8.6.5.3, lacking branchline restraint, unfinished install at various locations, modifications to the floorplan which are not protected or accounted for in the sprinkler design, etc.
INSP-Sprinkler Rough-in/Hydro1/17/20121/17/20121/20/2012PNR
DetailsForrest France
Follow up rough-in inspection of System 8 Mechanical and Sub-Fab Phone #: ###-#### >> Inspection requested via web by Alicia Pauley *NOTE* Previous correction notice items dated 1/12 are incomplete- no change from last visit.
INSP-Sprinkler Rough-in1/11/20121/12/20121/12/2012AFAIL
DetailsForrest France
Noted overspaced heads at coverage below ductwork, added room without sprinkler protection, incompleted install at the stair tower and elevator pit, deleted heads in a calc. area, obstructions at various heads due to proximity to facility equipment, pendent heads are installed in place of uprights at several locations. NOTE:* Construction, installation of mechanical equipment, process piping etc. has been allowed to proceed to such a point where numerous areas of this new system piping and sprinklers are now inaccessible or concealed from view. See requirements per IFC 2009 106.3 regarding " work to remain accessible and exposed for inspection purposes".
INSP-Sprinkler Rough-in1/10/20121/11/20121/11/2012PFAIL
DetailsForrest France
Inspection for intended for system # 8- contractor missing approved plans on site. Completed initial walk of this area and noted some items including two mixed temp. heads, blocked uprights at unistrut hangers, overspaced coverage adjacent to the west plenum wall, a vestibule without coverage, obstruction >4'. Need stamped plans for verification installation meets design, bracing locations, etc.
Fees Due Hold1/6/2012 1/6/2012 DONE
DetailsRita DeYoung
Fees Due Hold12/31/2011 1/5/2012 DONE
DetailsRita DeYoung
Fees Due Hold12/15/2011 12/30/2011 DONE
DetailsPatricia Smith
signed off per rita
Sprinkler Plan Check12/14/2011 12/14/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  12/14/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire12/14/2011 12/14/2011 DONE
DetailsPatricia Smith
Telephone call  12/14/2011 DONE
t/c w paul - permit (plan mod) ready and fees given
Permit Ready to Issue  12/14/2011 DONE
Details
CHANGE STATUS TO (ISS)  12/14/2011 DONE
DetailsTisha Gallop
Micron rep. picked up approved plan mod plans
(F) Reprint permit  12/14/2011 DONE
Plan resubmittals received  12/12/2011 DONE
DetailsTisha Gallop
received three copies of application, submittal binder and plans; routed to Tim Frost.
Sprinkler Plan Check8/25/2011 8/25/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/25/2011 DONE
DetailsTim Frost
Telephone call  8/25/2011 DONE
t/c w bob - permit (plan mod) denied - needs to be picked up and resubmitted
Miscellaneous action  8/25/2011 DONE
Emailed contractor review
Plan assigned to (Tim)8/23/2011 8/24/2011 DONE
DetailsTim Frost
Plan resubmittals received  8/23/2011 DONE
DetailsChristina Prado
PLAN MOD for sheets FP1, 4 & 5. Routed to Tim Frost for additional review
Plan assigned to (Tim)7/21/2011 7/27/2011 DONE
DetailsTim Frost
Sprinkler Plan Check7/27/2011 7/27/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/27/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/27/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire7/27/2011 7/27/2011 DONE
DetailsPatricia Smith
Telephone call  7/27/2011 DONE
left vm for bob - permit ready and fees given
Permit Ready to Issue  7/27/2011 DONE
Details
Issue and Print Permit  7/27/2011 DONE
DetailsBarbara Stitt
Case Summary  7/21/2011 DONE
Application received  7/21/2011