Miscellaneous action | | | 9/22/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Forward flush passed
|
INSP-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | CANC |
Troy Cobbley
|
|
|
over booked
|
INSP-Final Inspection | 9/15/2011 | 9/15/2011 | 9/15/2011 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per lonnie
|
INSP-Final Inspection | 9/6/2011 | 9/6/2011 | 9/6/2011 | P | FAIL |
Troy Cobbley
|
|
|
Need the forward flush passed and the fire alarm interconnections tested.
|
Plan assigned to (Tim) | 7/22/2011 | | 8/1/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/1/2011 | | DONE |
|
|
|
Recvd email from Jeff A with new Owner's Certificate. Questions remained unanswered. Therefore, I specifically stated the exact design criteria that I was approving. Any deviation from the commodity description or storage arrangement described within my review will required a complete resubmittal.
|
Sprinkler Plan Check | 8/1/2011 | | 8/1/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/1/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 8/1/2011 | | 8/1/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/1/2011 | | DONE |
|
|
|
left vm for jeff - permit ready and fees given
|
Permit Ready to Issue | | | 8/1/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/1/2011 | | DONE |
|
|
|
|
Miscellaneous action | | | 7/26/2011 | | DONE |
|
|
|
Sent the following email to Jeff Anderson of TREASURE VALLEY FIRE PROTECTION
Jeff,
I need a completed and signed Owner's Certificate before I can begin the review of this project. Are these paper records or some type of plastic disks etc.? Are they in cardboard containers or some other type of cabinet?
I would also like to point out some relative new and pertinent code sections for your review.
NFPA 13: 3.9.1.2, 3.9.1.3, 3.9.1.4, 8.15.9, 20.5, 20.6
I need to have enough information to identify which code sections apply if any.
Right now it looks like Table 13.2.1. applies based on Class III commodity.
As soon as I receive this information; I will be able to begin the review process.
A floor control valve will be required per BMC ordinate if and when a second floor is added to this facility.
As always, thank you for your time and cooperation in this matter.
|
Application received | | | 7/22/2011 | | |
|
|
|
|