Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00374
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2667 S VICTORY VIEW WAY
Project NameD & A COMPANIES
Customer NumberUDG ONLY
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of installing 188’ of C-900 6” underground piping with necessary thrust blocks, coating and retainers.

Contractor’s Note: The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit they will do so on their own cognizance.


Building Department Scope:

D & A Glass - (FOUNDATION PERMIT) - This permit is issued to do site grading and drainage, to pour footings and foundation and do underground utilities for the future construction of the new D & A Glass Company two story bulding. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. The building will be constructed under permit BLD11-00946. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/24/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection1/3/20121/4/20121/4/2012APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in12/7/201112/8/201112/8/2011APASS
DetailsTroy Cobbley
The second floor office sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in/Hydro11/30/201111/30/201111/30/2011PPASS
DetailsTroy Cobbley
Underground hydro test and flush passed.
INSP-Sprinkler Rough-in8/3/20118/4/20118/4/2011APASS
DetailsTroy Cobbley
The underground supply piping is ok to cover. The installation of the tie in to the United water tap does not match plan and the fire aprinkler contractor decided not to install the PIV but to install a wall PIV. This change is to be shown on the overhead pipng submittals.
Miscellaneous action  8/4/2011 DONE
Email sent to TREASURE VALLEY FIRE PROTECTION

No resubmittal will be required. However, please, make sure the underground is accurately reflected on the above ground drawings when they are submitted.








Cordially,

Tim Frost, S.E.T.
Fire Sprinkler Plans Examiner
Fire Plans Examiner
Fire Inspector II
City of Boise

###-####
tfrost@cityofboise.org

>>> "Greg Patrick" 8/3/2011 1:41 PM >>>

Tim,
We had to make a modification to the site fire service configuration this morning. Due to the location of the existing service stub and other site complications, we had to move the service to the west approximately 10'-0". This change took the service out of the planter area requiring the deletion of the yard PIV. We will install a wall PIV at the fire riser room in lieu of the yard PIV. These changes will be clearly shown on the overhead submittal, forthcoming and are also shown on the as-built sketch attached. We have an inspection scheduled with Troy and are hopeful that this is an acceptable as-built scenario that will not require a full plan mod or resubmittal. Could you please review and confirm?

If you have any questions please call me. Thanks for your help.
Issue and Print Permit  8/3/2011 DONE
Plan assigned to (Tim)7/28/2011 8/2/2011 DONE
DetailsTim Frost
Sprinkler Plan Check8/2/2011 8/2/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/2/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/2/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire8/2/2011 8/2/2011 DONE
DetailsDarla L Downs
Permit Ready to Issue  8/2/2011 DONE
Telephone call  8/2/2011 DONE
8-2-11 called Greg left message permit ready and fee given ///dld
Application received  7/28/2011