Miscellaneous action | | | 10/13/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The EOL was 2/10 of a volt outside the allowed minimum voltage. Since the panel is going to be replaced in two days it was agreed to allow this temporary condition.
|
INSP-Final Inspection | 9/28/2011 | 9/28/2011 | 9/28/2011 | P | FAIL |
Troy Cobbley
|
|
|
An additional strobe is required in Office 116. Also we could not verify EOL voltage due to the panel not operating when AC power is turned off. A fire watch will be required until the panel is repaired or replaced. I spoke to Charlie with SimplexGrinnell about this and gave him the phone number to contact the fire chief.
|
Plan assigned to (Stephanie) | 8/1/2011 | | 8/12/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 8/12/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 8/12/2011 | | 8/12/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/12/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 8/12/2011 | | 8/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/12/2011 | | DONE |
|
|
|
left vm for dante - permit ready and fees given
|
Permit Ready to Issue | | | 8/12/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 8/1/2011 | | |
|
|
|
|