Miscellaneous action | | | 1/20/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 12/20/2011 | 12/21/2011 | 12/21/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Miscellaneous action | | | 12/21/2011 | | DONE |
|
|
|
Received documentation verifying the smoke detectors shown on the plans in the bathroom were a typographical error and not intended (or required) to be installed.
|
INSP-Alarm Testing | 11/29/2011 | 12/1/2011 | 12/1/2011 | A | FAIL |
Troy Cobbley
|
|
|
The strobes in the four patient rooms are overspaced. The two smoke detectors in the restrooms between the patient rooms are missing and will need to be installed or ok'd by plan review to remain deleted. The smoke detector at the double doors to the pedestrian walkway was left above the ceiling. The lone smoke detector that was left in the main corridor after the double doors were demo'd needs to be removed.
|
Plan assigned to (Stephanie) | 11/3/2011 | | 11/7/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 11/7/2011 | | 11/7/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/7/2011 | | DONE |
|
|
|
Approved redlined plan modification documents available at front counter.
|
Inspection Record Card- Fire | 11/7/2011 | | 11/7/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/7/2011 | | DONE |
|
|
|
left vm for dante - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 11/7/2011 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/7/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/7/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/3/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: Received two copies of application, submittal folder and plans; routed to Fire Review.
|
Issue and Print Permit | | | 8/15/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/1/2011 | | 8/12/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 8/12/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 8/12/2011 | | 8/12/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved - see review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/12/2011 | | DONE |
|
|
|
Approved plans available at front counter.
|
Inspection Record Card- Fire | 8/12/2011 | | 8/12/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/12/2011 | | DONE |
|
|
|
left vm for dante - permit ready and fees given
|
Permit Ready to Issue | | | 8/12/2011 | | DONE |
|
|
|
|
Application received | | | 8/1/2011 | | |
|
|
|
|