INSP-Final Inspection | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | CANC |
Troy Cobbley
|
|
|
Permit was called in twice.
|
INSP-Final Inspection | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | FAIL |
Troy Cobbley
|
|
|
Can't final yet but the rough-in portion is passed. The dry wall ceiling has been removed to expose the piping. So when that is done and the painting is completed this permti can be finaled.
|
Override - Parcel Holds | 8/5/2011 | 1/1/1900 | 8/5/2011 | | |
|
|
|
fire final
|
INSP-Final Inspection | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to inspection load. I requested for the contractor to reschedule.
|
Override - Parcel Holds | 8/4/2011 | 1/1/1900 | 8/4/2011 | | |
|
|
|
fir final
|
Override - Parcel Holds | 8/4/2011 | 1/1/1900 | 8/4/2011 | | |
|
|
|
not in this modification area
|
Application received | | | 8/3/2011 | | |
|
|
|
|
Pending Assignment by SAM | 8/3/2011 | | 8/3/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Tim) | 8/3/2011 | | 8/3/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/3/2011 | | 8/3/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/3/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2011 | | DONE |
Tim Frost
|
|
|
|
Override - Parcel Holds | | | 8/3/2011 | | |
|
|
|
|
Inspection Record Card- Fire | 8/3/2011 | | 8/3/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/3/2011 | | DONE |
|
|
|
t/c w george - permit ready and fees given
|
Override - Parcel Holds | | | 8/3/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/3/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/3/2011 | | |
|
|
|
|
Issue and Print Permit | | | 8/3/2011 | | DONE |
|
|
|
|