Final inspection | | | 9/22/2011 | | DONE |
Christina Prado
|
|
|
Signed off 9-21-2011
|
Miscellaneous action | | | 9/22/2011 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Sprinkler Rough-in/Hydro | 9/21/2011 | 9/22/2011 | 9/21/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The storage racking has been modified to be 4'-0" in height. Brice, the general contractor, has been notified that the storage on these shelves can not exceed 5'-0" in height.
|
INSP-Sprinkler Rough-in | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | FAIL |
Troy Cobbley
|
|
|
Remove the masking tape from the upright heads in the riser room. Replace the painted head over the facp. Resubmit plans addressing the rack storage which is not allowed per the existing scope of work.
|
Inspection Record Card- Fire | 9/13/2011 | | 9/13/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/13/2011 | | DONE |
|
|
|
left vm for jim darr - permit ready and fees given
|
Permit Ready to Issue | | | 9/13/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/13/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 8/9/2011 | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/12/2011 | | DONE |
|
|
|
Received phone call from Jim Darr he said he would lower the sq ft per head to 109 sqft so the hydraulics calculations would work.
|
Sprinkler Plan Check | 9/12/2011 | | 9/12/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/7/2011 | | DONE |
|
|
|
Received new owner's certificate, complete combustible storage form, new flow test, old flow test and hydraulics.
|
Miscellaneous action | | | 9/7/2011 | | DONE |
|
|
|
Waiting on phone call back from Jim Darr. There is a maximum sqft spacing issue.
|
Miscellaneous action | | | 8/29/2011 | | DONE |
|
|
|
Received an Owner's Certificate. Indicates plastic storage up to 8'
|
Miscellaneous action | | | 8/10/2011 | | DONE |
|
|
|
Sent email requesting, owner's certificate, combustible storage form, old flow info, new flow info, old hydraulic demand.
|
Application received | | | 8/9/2011 | | |
Barbara Stitt
|
|
|
|