Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 10/17/2011 | 10/17/2011 | 10/17/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue permit | | | 10/13/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 10/13/2011 | | 10/13/2011 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | FAIL |
Troy Cobbley
|
|
|
Signals are now being reported correctly. As-builts/Intelipro information was not provided as requested by plan review.
|
Miscellaneous action | | | 10/5/2011 | | DONE |
|
|
|
I recieved and email from Lori at Alarmco asking if they could use an IntelliPro instead of an IntelliTap with the AES. I let her know that for this particular fire alarm panel, it is approved to use the AES-7794 IntelliPRO PROVIDED only the CID/Pulse format be used. I also asked her to please provide this information to the inspector for field verification.
|
INSP-Final Inspection | 9/30/2011 | 9/30/2011 | 9/30/2011 | P | FAIL |
Troy Cobbley
|
|
|
Tested the flow switch, tamper #1 and main lobby pull station. Paul received the signals from the relays but no informaton from the intela tap came in.
|
INSP-Final Inspection | 9/28/2011 | 9/28/2011 | 9/28/2011 | P | FAIL |
Troy Cobbley
|
|
|
Tamper #1 needs adjusted, could not find the inspectors test valve so the flow switch was not tested. Also need the tamper switch and manual pull stations addresses on the panel to match the map and what is reported to central station. All other items were tested. Horns did not sync but Gary fixed this while I waited.
|
INSP-Final Inspection | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | FAIL |
Troy Cobbley
|
|
|
Did not perform the testing due to the intella tap not being installed on the AES dialer.
|
INSP-Final Inspection | 9/21/2011 | 9/22/2011 | 9/22/2011 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations of corrections needed. No actual testing was performed
|
CHANGE STATUS TO (ISS) | | | 9/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Stephanie) | 9/12/2011 | | 9/20/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 9/20/2011 | | 9/20/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/20/2011 | | DONE |
|
|
|
Approved redlined plan modification documents available at front counter.
|
Inspection Record Card- Fire | 9/20/2011 | | 9/20/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/20/2011 | | DONE |
|
|
|
t/c w lori - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 9/20/2011 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/19/2011 | | DONE |
|
|
|
The contractor chose to provide a beam detector instead of the originally submitted heat detectors due to ceiling heights/peaks/beams causing problems with meeting spacing requirements. The beam detector was shown on the plans without any indications of roof-line details, ceiling heights, or beam placement (see 2009 IFC 907.1.2 #11). I decided to do a site visit to try and help the contractor with a solution to the detection problem. During that site visit, it was determined that the proposed beam detector location would not sufficiently cover the Rig Room area, and that a possible solution might be to move the beam detector and it’s receiver to the wall. However due to obstructions from fire trucks, mechanical ducting, and lighting fixtures, the wall location would not meet the listing of the device either. It was determined that the component could not be approved because it would not meet the specifications or purpose of the device. After explaining this to the contractor, Alarmco informed me that Mitch Caldwell decided that since detection is not required in this space, that there would be no detection provided in the Rig Room area.
|
Plan resubmittals received | | | 9/15/2011 | | DONE |
Christina Prado
|
|
|
Received two new sets of plans and specs
|
Plan resubmittals received | | | 9/12/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: received two copies of application, folder and plans; routed to Fire review.
|
INSP-Conference | 8/31/2011 | 8/31/2011 | 8/31/2011 | P | DONE |
Troy Cobbley
|
|
|
Performed site visit to determine placement of heat detectors and found that the city approved plans do not show the heat detectors spaced for "sloped" ceilings, "High" ceilings or spacing taking "beam construction" into account. The plans also do not reflect the existing fire sprinkler riser which includes two interior tamper switches, an exterior wall PIV and a flow switch. After a discussion with plan review it was determined that a plan modification/resubmittal is needed to show this information. This was relayed to the fire alarm tech.
|
Issue and Print Permit | | | 8/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 8/10/2011 | | 8/22/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 8/22/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 8/22/2011 | | 8/22/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 8/22/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 8/22/2011 | | 8/22/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 8/22/2011 | | DONE |
|
|
|
t/c w lori - permit ready and fees given
|
Permit Ready to Issue | | | 8/22/2011 | | DONE |
|
|
|
|
Application received | | | 8/10/2011 | | |
|
|
|
|