Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR11-00418
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 101 S CAPITOL BLVD 4TH FLR
Project NameUS Bank 4th Floor
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and plugging sprinklers due to new wall and ceiling configuration. The system has a 2” loop with small telescoping branch piping.


Building Department Scope:

(MORGAN STANLEY - US Bank – 4th floor) Permit is to expand an existing 10,536 square foot office space into the adjacent 1,691 square foot office space. This expansion will now give Morgan Stanley occupancy for the entire 4th floor. Permit BLD06-00768 was issued upgrade this entire floor. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create two conference rooms, two offices, and additional open office area within the space], relocate existing break room sink, installation of new doors / hardware, installation of new tempered glazing, new lighting, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  12/16/2011 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection10/28/201110/31/201110/31/2011APASS
DetailsForrest France
Fire sprinkler permit work passed final walkthrough.
INSP-Final Inspection10/27/201110/28/201110/28/2011APART
DetailsForrest France
Project is not in condition for final at this time.
INSP-Sprinkler Rough-in10/20/201110/20/201110/20/2011PPART
DetailsForrest France
Verified additional coverage at the file storage room. Grid ceilings okay to cover.
INSP-Sprinkler Rough-in10/7/201110/7/201110/7/2011PPART
DetailsForrest France
Overhead modifications at the remodel area okayed for ceiling cover with the exception of one missing head at the file room- to be added and verified at final per discussion.
Plan assigned to (Tim)8/18/2011 8/24/2011 DONE
DetailsTim Frost
Sprinkler Plan Check8/24/2011 8/24/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/24/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/24/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire8/24/2011 8/24/2011 DONE
DetailsPatricia Smith
Telephone call  8/24/2011 DONE
t/c w brad - permit ready and fees given
Permit Ready to Issue  8/24/2011 DONE
Details
Issue and Print Permit  8/24/2011 DONE
Application received  8/18/2011  
Case Summary  8/18/2011 DONE
DetailsTisha Gallop