Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/21/2011 | 12/21/2011 | 12/21/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 12/6/2011 | 12/7/2011 | 12/7/2011 | A | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 10/25/2011 | 10/26/2011 | 10/25/2011 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional areas where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the "lab" room is ok to cover. The plywood sheating that is attached to the roof deck is fire treated. Yesterdays entry to provide upright protection is null and void.
|
INSP-Sprinkler Rough-in | 9/30/2011 | 10/3/2011 | 10/3/2011 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the office area marked in red where the sprinkler piping is ok to cover. The "lab" piping was requested for cover but the upright protection for the combustible concealed space above the ceiling has been removed. Uprights will need to be installed prior to an approval for cover given.
|
Plan assigned to (Tim) | 8/24/2011 | | 9/1/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/1/2011 | | 9/1/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/1/2011 | | DONE |
Tim Frost
|
|
|
|
Override - Parcel Holds | | | 9/1/2011 | | |
|
|
|
|
Inspection Record Card- Fire | 9/1/2011 | | 9/1/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/1/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Override - Parcel Holds | | | 9/1/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 9/1/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/1/2011 | | |
|
|
|
|
Issue and Print Permit | | | 9/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 8/30/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal small documents and plans; routed to Fire Review.
|
Sprinkler Plan Check | 8/29/2011 | | 8/29/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/29/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/29/2011 | | DONE |
|
|
|
Emailed review to contractor
|
Telephone call | | | 8/29/2011 | | DONE |
|
|
|
left vm for brodie - permit denied - needs to be picked up and resubmitted
|
Miscellaneous action | | | 8/29/2011 | | DONE |
Tisha Gallop
|
|
|
picked up denied plans
|
Application received | | | 8/24/2011 | | |
|
|
|
|