Permit Information
Permit NumberFIR11-00436
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 6140 W CURTISIAN AVE
Project NameST AL'S MOB #6
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers due to new wall and ceiling configuration.

Contractor’s Note: Scope of Work
The fire protection scope of work does not seem to correlate with the building department scope of work. This review is based on the scope of work indicated in the fire sprinkler application.

If the fire protection scope of work does not correlate with the building department scope of work, than a Certificate of Occupancy may be held and not granted until all work within the building department scope of work is verified. New drawings showing all the sprinklers within the building department scope of work are required to be submitted and reviewed.


Building Department Scope:

(ST. ALS - MOB #6)(STEREOTAXIS LAB - THIRD FLOOR) Remodel of an existing 3,100 sq. ft. portion of the third floor of an existing medical office building. Work to include select interior demolition of non-structrual partitions, finishes, millwork, etc. New work includes construction of new interior non-bearing walls to include the previous CT Scan Waiting & Reception area to become part of the relocated Control, Changing and access / egress path; interior walls to modify or create Lab, Work Area and Equipment rooms; new framed walls, fire-retardant treated wood or metal, around the Lab in accordance with requirements for adding additional RF lead shield for walls, glass, frames and doors as indicated on plans; structural modifications for installation of new medical equipment; protection and repair of existing fire-resistive assemblies; work on electrical, plumbing, mechanical, medical gas, fire suppression and alarm systems. All per approved plans, notes and all attached plan review comments / conditions. NOTE: This building is fully fire sprinklered. Drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/24/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection12/21/201112/21/201112/21/2011APASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in12/6/201112/7/201112/7/2011APASS
DetailsTroy Cobbley
The remaining sprinkler piping can be covered.
INSP-Sprinkler Rough-in10/25/201110/26/201110/25/2011APASS
DetailsTroy Cobbley
See the city approved plans for additional areas where piping is ok to cover.
INSP-Sprinkler Rough-in10/3/201110/4/201110/4/2011APASS
DetailsTroy Cobbley
The sprinkler piping in the "lab" room is ok to cover. The plywood sheating that is attached to the roof deck is fire treated. Yesterdays entry to provide upright protection is null and void.
INSP-Sprinkler Rough-in9/30/201110/3/201110/3/2011APART
DetailsTroy Cobbley
See the city approved plans for the office area marked in red where the sprinkler piping is ok to cover. The "lab" piping was requested for cover but the upright protection for the combustible concealed space above the ceiling has been removed. Uprights will need to be installed prior to an approval for cover given.
Plan assigned to (Tim)8/24/2011 9/1/2011 DONE
DetailsTim Frost
Sprinkler Plan Check9/1/2011 9/1/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  9/1/2011 DONE
DetailsTim Frost
Override - Parcel Holds  9/1/2011  
Inspection Record Card- Fire9/1/2011 9/1/2011 DONE
DetailsPatricia Smith
Telephone call  9/1/2011 DONE
t/c w brodie - permit ready and fees given
Override - Parcel Holds  9/1/2011  
Permit Ready to Issue  9/1/2011 DONE
Details
Override - Parcel Holds  9/1/2011  
Issue and Print Permit  9/1/2011 DONE
DetailsBarbara Stitt
Plan resubmittals received  8/30/2011 DONE
DetailsTisha Gallop
received three copies of application, submittal small documents and plans; routed to Fire Review.
Sprinkler Plan Check8/29/2011 8/29/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/29/2011 DONE
DetailsTim Frost
Miscellaneous action  8/29/2011 DONE
Emailed review to contractor
Telephone call  8/29/2011 DONE
left vm for brodie - permit denied - needs to be picked up and resubmitted
Miscellaneous action  8/29/2011 DONE
DetailsTisha Gallop
picked up denied plans
Application received  8/24/2011