Miscellaneous action | | | 9/27/2012 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | PASS |
Forrest France
|
|
|
Corrections and remainder of acceptance testing completed satisfactory. Fire alarm permit finaled.
|
INSP-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | NR |
Troy Cobbley
|
|
|
I tested all of the fire sprinkler device interconnections with the fire alarm system. I also verified most corrections previously noted by Forrest. The smoke detector for door release located on the first floor is still an issue.
|
Telephone call | | | 7/16/2012 | | DONE |
|
|
|
Per the contractor, the header on the door located by the main lobby east is less than 24", and with it being a fire door (not a smoke door), the desired protection is for both directions, therefore either (not both) of the smoke detectors shown may be eliminated.
|
INSP-Final Inspection | 7/13/2012 | 7/13/2012 | 7/13/2012 | P | CANC |
Troy Cobbley
|
|
|
Overbooked due to inspection load. Contractor notified. I spoke to the installing electrician and deferred him to Romeo Gervais about the horn heights and the problem with placing the smoke detecotrs for door release within 5' and center of the doors. Romeo later called me back and stated that he is ok with the horn height as long as the required sound level is met but the smoke detectors for door release will need to meet code or an alternative will need to be proposed that meets the intent of the code. I also spoke to Jason with AEI about these issues.
|
INSP-Final Inspection | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | FAIL |
Forrest France
|
|
|
Items noted during initial acceptance test include; horn only appliances throughout all units on all floors do not meet mounting heights per NFPA 72, need to relocate SD at the 1st and 2nd floor north elevator lobbies, relocate one SD for door hold release at the 1st floor, provide A/V at the1st floor laundry room per plan, repair one WP A/V at the parking garage, post signage at the doors to the FACP room, cd settings at five locations adjusted while on site. Items tested okay include all five ID detectors for damper shutdown, MP at the panel, and notification testing on all floors. Sprinkler monitoring, elevator recall, NAC's, EOL's and panel items not tested.
|
FIR-Aging Inspection | 5/1/2012 | 5/1/2012 | 5/1/2012 | | DONE |
Forrest France
|
|
|
Work in progress, construction underway.
|
Issue permit | | | 10/14/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Fees Due Hold | 10/13/2011 | | 10/14/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/8/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/25/2011 | | 9/7/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 9/7/2011 | | DONE |
|
|
|
Called Jason at AEI to verify there are no balconies - he clarified that what is shown on the plans (appears to be accessable balconies) is actually just the roofline below.
|
1st review completed | | | 9/7/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 9/7/2011 | | 9/7/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/7/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Permit Ready to Issue | | | 9/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 9/7/2011 | | 9/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/7/2011 | | DONE |
Barbara Stitt
|
|
|
Called Jason and told him that permit is rady & fees due on 9-7-11 @ 3:10pm//BAS
|
Application received | | | 8/25/2011 | | |
|
|
|
|