Miscellaneous action | | | 10/13/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
Miscellaneous action | | | 10/6/2011 | | DONE |
|
|
|
asbuilt documents received
|
Plan resubmittals received | | | 10/6/2011 | | DONE |
|
|
|
|
INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
Issue and Print Permit | | | 9/30/2011 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/14/2011 | | 9/14/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/14/2011 | | DONE |
|
|
|
t/c w trent - permit ready and fees given
|
Permit Ready to Issue | | | 9/14/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 8/29/2011 | | 9/13/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 9/13/2011 | | DONE |
|
|
|
Recieved the submittal application, however it was not signed. I called and spoke to Brent who then said he would have it to me by noon.
|
Miscellaneous action | | | 9/13/2011 | | DONE |
|
|
|
Requested information received.
|
1st review completed | | | 9/13/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 9/13/2011 | | 9/13/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/13/2011 | | DONE |
|
|
|
Approved plans available at front counter.
|
Telephone call | | | 9/12/2011 | | DONE |
|
|
|
Called Tim at Crane to remind him I need the Permit Application to go along with the permit checklist. Tim was not available so I spoke with Marilyn.
|
Telephone call | | | 9/9/2011 | | DONE |
|
|
|
Called Tim at Crane to remind him I need the Permit Application to go along with the permit checklist.
|
Telephone call | | | 9/6/2011 | | DONE |
|
|
|
Called Tim at Crane to remind him I need the Permit Application to go along with the permit checklist.
|
Telephone call | | | 9/1/2011 | | DONE |
|
|
|
Called Tim at Crane to remind him I need the Permit Application to go along with the permit checklist.
|
Application received | | | 8/29/2011 | | |
|
|
|
|