INSP-Final Inspection | 12/14/2011 | 12/15/2011 | 12/16/2011 | A | PASS |
Forrest France
|
|
|
Verified completed adjustments. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 11/18/2011 | 11/21/2011 | 11/21/2011 | A | PEND |
Forrest France
|
|
|
Scope of work is complete. Final pending adjustments to coverage at two locations. Unistrut installed adjacent to pendent heads obstructs pattern development.
|
Fees Due Hold | 10/13/2011 | | 10/31/2011 | | DONE |
Patricia Smith
|
|
|
|
INSP-Sprinkler Rough-in | 9/28/2011 | 9/29/2011 | 9/30/2011 | P | PART |
Forrest France
|
|
|
Overhead fire sprinkler work approved for cover. Upright head separation and one missing pendent head to be verified at final.
|
Sprinkler Plan Check | 9/29/2011 | | 9/29/2011 | | PASS |
Troy Cobbley
|
|
|
Reviewed as built drawings - Passed
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2011 | 9/27/2011 | 9/28/2011 | P | NR |
Forrest France
|
|
|
Plans are not consistent with the field installation.
|
Sprinkler Plan Check | 9/23/2011 | | 9/23/2011 | | PASS |
Troy Cobbley
|
|
|
|
1st review completed | | | 9/23/2011 | | DONE |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2011 | | DONE |
Troy Cobbley
|
|
|
|
Issue and Print Permit | | | 9/23/2011 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 8/29/2011 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 8/29/2011 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|