Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/6/2012 | 1/9/2012 | 1/9/2012 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/9/2012 | 1/9/2012 | 1/9/2012 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 1/6/2012 | 1/9/2012 | 1/9/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | CANC |
Troy Cobbley
|
|
|
Final for alarms Phone #: ###-#### >> Inspection requested via web by John Venche
|
INSP-Final Inspection | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by John Venche
|
INSP-Alarm Testing | 1/5/2012 | 1/6/2012 | 1/5/2012 | A | CANC |
Troy Cobbley
|
|
|
Final for Fire Alarm Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
INSP-Sprinkler Rough-in/Hydro | 1/5/2012 | 1/6/2012 | 1/5/2012 | A | CANC |
Troy Cobbley
|
|
|
FINAL FOR ALARM Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
INSP-Alarm Testing | 12/20/2011 | 12/21/2011 | 12/21/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancel per contractors request.
|
INSP-Final Inspection | 12/20/2011 | 12/21/2011 | 12/21/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancel per contractors request.
|
INSP-Sprinkler Rough-in/Hydro | 12/8/2011 | 12/9/2011 | 12/9/2011 | A | PASS |
Troy Cobbley
|
|
|
Hydro test on overhead system passed.
|
Issue and Print Permit | | | 11/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 11/23/2011 | | 11/29/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/29/2011 | | 11/29/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/29/2011 | | 11/29/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/29/2011 | | DONE |
|
|
|
t/c w john - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 11/29/2011 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | FAIL |
Troy Cobbley
|
|
|
I witnessed the overhead hydro test twice but it failed both times.
|
INSP-Sprinkler Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 | P | PASS |
Troy Cobbley
|
|
|
Installation appears ok and matches the as-built plans that are going to be resubmitted for review. However the flat faced bushing still has not been replaced.
|
Plan resubmittals received | | | 11/23/2011 | | DONE |
Christina Prado
|
|
|
PLAN MOD*** Received three sets of revised plan sheets; applications; checklists and calcs. Plans and documents given to Tim Frost for review
|
INSP-Sprinkler Rough-in/Hydro | 10/13/2011 | 10/14/2011 | 10/14/2011 | A | FAIL |
Troy Cobbley
|
|
|
The piping as installed appears ok. The problem is the 3" main has been re-routed around a hood which has added an additional elbow and tee to the hydraulic calculations. Pipe routing and size has changed in a closet as well both of these items are located in remote area #2. The designer needs to verify with plan review that the hydraulic calculations are still adequate for this area. A flat face bushing has been installed which is not allowed per NFPA 13. A upright head in the same area as the two hoods is blocked by duct work and when the hoods are installed additional blockage may occur. I spoke to the general contractor, Todd, about the coolers and he stated that piping modifications will be required due to the height of the coolers conflicting with the sprinkler piping which is also located in remote area #2. The hydro test for today is cancelled due to the dry pendants not being installed and the flat face bushing needing to be removed as well as apparent changes needed to the piping as installed.
|
INSP-Sprinkler Rough-in | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Troy Cobbley
|
|
|
The piping above the hardlids is ok to cover
|
INSP-Supply line flush | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Troy Cobbley
|
|
|
The supply line flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Troy Cobbley
|
|
|
The underground cover passed.
|
Plan assigned to (Tim) | 9/6/2011 | | 9/6/2011 | | DONE |
Tim Frost
|
|
|
put in fee status by mistake
|
Sprinkler Plan Check | 9/6/2011 | | 9/6/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/6/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/6/2011 | | 9/6/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/6/2011 | | DONE |
|
|
|
t/c w teresa - permit ready and fees given
|
Permit Ready to Issue | | | 9/6/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/6/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/1/2011 | | 9/2/2011 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/1/2011 | | |
|
|
|
|