Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 10/17/2011 | 10/18/2011 | 10/18/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/17/2011 | 10/18/2011 | 10/17/2011 | P | CANC |
Troy Cobbley
|
|
|
please contact Jeremy at ###-#### Phone #: ###-#### >> Inspection requested via web by David Dilley Inspection cancelled from web by: David Dilley
|
INSP-Final Inspection | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Jeremy at ###-####
|
INSP-Final Inspection | 9/16/2011 | 9/19/2011 | 9/19/2011 | A | FAIL |
Troy Cobbley
|
|
|
All items tested ok except the interconnection of wires run between the buildings. The circuits were not installed in metalic conduit as per the redlined plans, but instead in PVC. After confiring with Doug Poedy it was clear in both NFPA 72 and NEC that the only options for the interbuilding fire alarm circuiting are: provide a metalic cable shield (grounded to the building electrode system), run in metalic conduit (grounded to the building electrode system), or provide isolation modules. Items also needing addressed are the descriptions for the HVAC units in the records storage building.
|
INSP-Final Inspection | 9/15/2011 | 9/16/2011 | 9/16/2011 | P | CANC |
Troy Cobbley
|
|
|
Please contact Jeremy at ###-#### Phone #: ###-#### >> Inspection requested via web by David Dilley Inspection cancelled from web by: David Dilley
|
Plan assigned to (Stephanie) | 9/6/2011 | | 9/9/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/9/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 9/9/2011 | | 9/9/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/9/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 9/9/2011 | | 9/9/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/9/2011 | | DONE |
|
|
|
left vm for ken - permit ready and fees given
|
Permit Ready to Issue | | | 9/9/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/9/2011 | | DONE |
|
|
|
|
Application received | | | 9/6/2011 | | |
|
|
|
|