Miscellaneous action | | | 1/20/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 1/12/2012 | 1/17/2012 | 1/17/2012 | A | PASS |
Forrest France
|
|
|
Fire alarm work passed inspection. Two added SD in the corridor per red-lines okayed.
|
Issue and Print Permit | | | 9/30/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/15/2011 | | 9/28/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/28/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 9/28/2011 | | 9/28/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/28/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Telephone call | | | 9/28/2011 | | DONE |
|
|
|
Spoke to Brian with YMC (mechanical contractor) to verify the scope of work for the attached mechanical permit. He let me know that the HVAC work was not affecting the duct detectors, however they are adding two new fire/smoke dampers. I then spoke with Jim Shilton with Honeywell and it was agreed the full area detection would meet the code requirements to shut down the additional fire/smoke dampers.
|
Inspection Record Card- Fire | 9/28/2011 | | 9/28/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/28/2011 | | DONE |
|
|
|
left vm for scott - permit ready and fees given
|
Permit Ready to Issue | | | 9/28/2011 | | DONE |
|
|
|
|
Application received | | | 9/15/2011 | | |
|
|
|
|