Miscellaneous action | | | 2/24/2012 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 2/2/2012 | 2/9/2012 | 2/10/2012 | A | NR |
Forrest France
|
|
|
Insufficient netcon rating.
|
INSP-Final Inspection | 1/19/2012 | 1/26/2012 | 1/26/2012 | P | FAIL |
Troy Cobbley
|
|
|
No testing was performed due to the need to install shielded wire per the installation manual. Also need a map for the facp. As-builts need to be provided showing the supervisory being actually a trouble signal. Plan review is ok with this since the panel is not capable of a separate supervisor signal. I also spoke to the apartment manager about providing the required Knox Key Box and the annual inspections for the fire sprinkler system being seven years old. Necton was not verified.
|
Issue and Print Permit | | | 9/30/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/15/2011 | | 9/29/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/29/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 9/29/2011 | | 9/29/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 9/29/2011 | | DONE |
|
|
|
Approved plans available at front counter.
|
Inspection Record Card- Fire | 9/29/2011 | | 9/29/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/29/2011 | | DONE |
|
|
|
t/c w rose - permit ready and fees given
|
Permit Ready to Issue | | | 9/29/2011 | | DONE |
|
|
|
|
Application received | | | 9/15/2011 | | |
|
|
|
|