INSP-Final Inspection | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 | P | FAIL |
Troy Cobbley
|
|
|
The overspaced pendant has been corrected. Will be able to final when the ceiling tile is installed.
|
INSP-Sprinkler Rough-in | 9/26/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. I noted a conference room in the southwest corner of the new space were the small room rule is being used off of two walls. I spoke to jeff about it.
|
Application received | | | 9/23/2011 | | |
|
|
|
|
Pending Assignment by SAM | 9/23/2011 | | 9/23/2011 | | DONE |
Patricia Smith
|
|
|
|
Plan assigned to (Tim) | 9/23/2011 | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/23/2011 | | 9/23/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/23/2011 | | 9/23/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/23/2011 | | DONE |
|
|
|
left vm for greg - permit ready and fees given
|
Permit Ready to Issue | | | 9/23/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|