INSP-Final Inspection | 10/14/2011 | 10/14/2011 | 10/14/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
Installation passed. Need ceiling tile installed and access to the fire sprinkler riser room to verify the annual inspection and to verify a clear fire alarm panel.
|
Issue and Print Permit | | | 10/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 9/23/2011 | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/23/2011 | | 9/23/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/23/2011 | | 9/23/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 9/23/2011 | | DONE |
|
|
|
t/c w shelby - permit ready and fees given
|
Permit Ready to Issue | | | 9/23/2011 | | DONE |
|
|
|
|