INSP-Final Inspection | 5/31/2012 | 6/1/2012 | 6/1/2012 | A | PASS |
Forrest France
|
|
|
Scope of work completed, inspection passed. Fire sprinkler permit finaled.
|
CHANGE STATUS TO (ISS) | | | 5/31/2012 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 3/30/2012 | | 3/30/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/30/2012 | | DONE |
Tim Frost
|
|
|
|
INSP-Final Inspection | 1/25/2012 | 1/27/2012 | 1/27/2012 | P | CANC |
Forrest France
|
|
|
Meet in B.25 plan review room Phone #: ###-#### >> Inspection requested via web by John Wheeler Inspection cancelled from web by: John Wheeler
|
Fees Due Hold | 10/29/2011 | | 10/31/2011 | | DONE |
Patricia Smith
|
|
|
|
Sprinkler Plan Check | 10/13/2011 | | 10/13/2011 | | PASS |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/13/2011 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/7/2011 | | 10/7/2011 | | FAIL |
Troy Cobbley
|
|
|
Failed - Change pipe sizes to match existing
|
1st review completed | | | 10/7/2011 | | DONE |
Troy Cobbley
|
|
|
|
Plan assigned to (Scott) | | | 9/28/2011 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 9/28/2011 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|