Miscellaneous action | | | 9/21/2012 | | DONE |
|
|
|
Sent to records for scanning.
|
INSP-Final Inspection | 9/4/2012 | 9/4/2012 | 9/5/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan resubmittals received | | | 9/5/2012 | | DONE |
Tisha Gallop
|
|
|
received one set of as-builts; taken to Tim Frost.
|
Miscellaneous action | | | 9/5/2012 | | DONE |
|
|
|
Recevied Final As Built Drawings
|
INSP-Final Inspection | 8/29/2012 | 8/30/2012 | 8/30/2012 | P | NR |
Forrest France
|
|
|
|
INSP-Supply line flush | 8/27/2012 | 8/27/2012 | 8/27/2012 | P | PASS |
Troy Cobbley
|
|
|
The forward flow test passed.
|
Sprinkler Plan Check | 8/27/2012 | | 8/27/2012 | | PASS |
Tim Frost
|
|
|
Reviewed hydraulic calculation Remote Area 2 for as built changes. The hydraulics appear to be adequate.
The safety factor/cushion changed 1.8# to 7.5# which is 11%
|
INSP-Sprinkler Rough-in | 8/23/2012 | 8/24/2012 | 8/24/2012 | P | PART |
Troy Cobbley
|
|
|
Earthquaking in the basement has been correct and piping can now be covered. The rough-in for the piping in the Chiller is basically ok except a upright has been installed in a pendant position, one upright needs to be change and installed as a pendant to clear a beam and the hydraulic calculations need to be resubmitted for the chiller room since seven 1" elbows have been installed on one of the branchlines to the heads in the remote area.
|
INSP-Sprinkler Rough-in/Hydro | 8/22/2012 | 8/23/2012 | 8/23/2012 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was a rough to cover in basement and chiller. Earthquake bracing is missing on the 2 1/2" main in the basement. Tyler and I started inspection with the wrong set of plans. We decided to continue the inspection tomorrow with the correct set of plans and the earthquake bracing installed. Also it does not appear that the small orfice heads have been installed in the showers as required on 4/4/2012.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2012 | 8/14/2012 | 8/14/2012 | A | PASS |
Troy Cobbley
|
|
|
Hydro tests of the overhead systems and the remote FDC supply piping passed.
|
INSP-Sprinkler Rough-in/Hydro | 8/13/2012 | 8/13/2012 | 8/13/2012 | P | FAIL |
Troy Cobbley
|
|
|
Hydro inspection for the overhead system failed due to visable pressure loss at all three guages.
|
INSP-Sprinkler Rough-in/Hydro | 8/9/2012 | 8/10/2012 | 8/10/2012 | P | CANC |
Troy Cobbley
|
|
|
Need a Hydro Inspection Fri 8.10 hoping for 2PM - Tyler Miller is he contact at ###-#### Phone #: ###-#### >> Inspection requested via web by Kindel de Leon Inspection cancelled from web by: Kindel de Leon
|
CHANGE STATUS TO (ISS) | | | 8/1/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/1/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/17/2012 | | 7/19/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/19/2012 | | 7/19/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/19/2012 | | 7/19/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 7/19/2012 | | |
|
|
|
|
Telephone call | | | 7/19/2012 | | |
|
|
|
7-19-12 called Phoenit Fire- left message for Trent permit ready and fee given ///dld
|
Plan resubmittals received | | | 7/18/2012 | | DONE |
Christina Prado
|
|
|
Received three new sets of plans marked 2 thru 5 and routed to Tim for review
|
Plan resubmittals received | | | 7/17/2012 | | DONE |
|
|
|
Rec'd plan mod 3 copies
|
INSP-Sprinkler Rough-in | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | PASS |
Troy Cobbley
|
|
|
Lay-in tile can be installed. Overspaced heads will be verified later. Heads are overspaced in the Dressing Room. The 9' rule is being used off of two walls. Also the basement mechanical room needs to be resubmitted due to piping and head changes in the remote area.
|
INSP-Sprinkler Rough-in | 6/21/2012 | 6/22/2012 | 6/22/2012 | A | PART |
Troy Cobbley
|
|
|
Corrections in in the attic have been addressed except for the SD heads are too far from the peak as shown measured on the data sheet.
|
INSP-Supply line flush | 6/21/2012 | 6/22/2012 | 6/22/2012 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2012 | 6/20/2012 | 6/20/2012 | P | PASS |
Troy Cobbley
|
|
|
Chiller room underground hydro test passed.
|
INSP-Sprinkler Rough-in | 6/19/2012 | 6/20/2012 | 6/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Rough In inspection in the attic passed for the most part. It appears that some heads are overspaced from walls are too close together and possibly too far down from the deck. The data sheets for the "Attic" heads was not available on site. The fitter will get data sheet and double check noted items and I will verify at a follow up inspection. I also noted two areas, both at the very east end of the attic, where coverage is lacking.
|
INSP-Sprinkler Rough-in/Hydro | 6/15/2012 | 6/18/2012 | 6/18/2012 | A | FAIL |
Troy Cobbley
|
|
|
Underground Hydro inspection for the chiller room failed due to visable drop in pressure on the guage.
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2012 | 6/12/2012 | 6/12/2012 | A | CANC |
Troy Cobbley
|
|
|
Cancel per phone conversation with Scott Carter
|
INSP-Sprinkler Rough-in | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Troy Cobbley
|
|
|
Remote area #3 piping can now be covered. Pipe routing changes and hydraulic calculations verified by Tim Frost.
|
INSP-Sprinkler Rough-in | 4/30/2012 | 4/30/2012 | 4/30/2012 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional areas in "area E" where sprinkler piping is ok to cover.
|
Sprinkler Plan Check | 4/30/2012 | | 4/30/2012 | | PASS |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
PLAN MOD rec'd 3 copies of submittal documents and plans, routed to Tim Frost
|
Plan assigned to (Tim) | 4/30/2012 | | 4/30/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 4/30/2012 | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
(F) Reprint permit | | | 4/30/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
INSP-Sprinkler Rough-in | 4/24/2012 | 4/25/2012 | 4/26/2012 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for Area E. See the approved plans for areas/rooms that are ok for cover. The entire area at remote area #3 needs to be resubmitted prior to approval for cover. Several of the 1" armovers have two to three times the fitting counts that are shown on the plans. The 1 1/4" branchline routing has changed with the installation of bull head tees to re-route the piping and the installation of 45 degree fittings to change elevations due to high ceilings. The wall layout has changed as well. I noted two areas that will be considered combustible concealed spaces that will need to be addressed.
|
INSP-Sprinkler Rough-in | 4/3/2012 | 4/4/2012 | 4/4/2012 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the Baptistry is ok to cover.
|
Miscellaneous action | | | 4/4/2012 | | DONE |
|
|
|
Received a PDF of remote area 4 along with new hydraulic calculations. The addtional, fittings have been included in the hydraulics. In addtion, the extended coverage sprinkler is now supplied directly from the main. The shower sprinklers have been changed to small orifice sprinklers. There is now a 10# safety factor.
|
INSP-Sprinkler Rough-in | 4/2/2012 | 4/3/2012 | 4/3/2012 | A | PART |
Troy Cobbley
|
|
|
Some piping can be covered. See the latest copy of the approved plans. But the plans do not reflect the actual piping/head arrangement. This is especially important in the hydraulic remote area #4. Additional elbows have been installed in the sprinkler drops that are not shown on the plans. Per plan review there is hardly any safety factor left over so additional fittings will adversely effect the operation of the sprinklers. Plans need to be resubmitted again showing the correct piping layout prior to a cover inspection being given. The remote area #4 is not the only area where piping does not match. One room has additional pendants and uprights where other rooms have pendants and uprights deleted.
|
Plan assigned to (Tim) | 3/28/2012 | | 4/2/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/2/2012 | | 4/2/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/2/2012 | | |
|
|
|
|
Inspection Record Card- Fire | 4/2/2012 | | 4/2/2012 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 4/2/2012 | | |
|
|
|
called permit ready and fee given ///dld
|
CHANGE STATUS TO (ISS) | | | 4/2/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 3/26/2012 | | 4/2/2012 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 3/28/2012 | | DONE |
Christina Prado
|
|
|
Plan Modification -- Resubmittal: received three copies of application, submittal documents and plan; routed to Fire Review
|
Sprinkler Plan Check | 3/27/2012 | | 3/27/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Plan resubmittals received | | | 3/26/2012 | | DONE |
Tisha Gallop
|
|
|
Plan Modification: received three copies of application, submittal documents and plan; routed to Fire Review
|
INSP-Sprinkler Rough-in | 3/15/2012 | 3/16/2012 | 3/16/2012 | A | PART |
Troy Cobbley
|
|
|
See the on site plans for several additional areas where sprinkler piping can be covered. Plan modifications showing all changes and job site construction conditionas need to be submitted for review prior to any more cover inspections due to the amount of changes that have occured to the routing of the sprinkler piping. One area of concern is at Remote Area #4 where a branchline has been deleted, upright protection revises, extended coverage pendant added and additional fittings installed in the piping. Per Tim Frost all of the walls in this area, "D", where to be full height but I saw walls that aren't full height. Also several large rooms have swapped from the south side of the building to the north side of the building. I spoke to Scott, the on site fitter forman, about the issues.
|
INSP-Sprinkler Rough-in | 2/27/2012 | 2/27/2012 | 2/27/2012 | P | PART |
Forrest France
|
|
|
Remainder of overhead work at the west end of waiting 151 at the sheetrock ceiling okayed for cover- see plan set marked and initialed with today's date- contractor to provide missing hanger at one armover as discussed.
|
INSP-Sprinkler Rough-in | 2/13/2012 | 2/13/2012 | 2/13/2012 | P | PASS |
Troy Cobbley
|
|
|
See the city approved for additional rooms that piping is ok to cover.
|
INSP-Sprinkler Rough-in | 2/8/2012 | 2/9/2012 | 2/9/2012 | A | PASS |
Troy Cobbley
|
|
|
UG supply and Remote FDC are ok to cover. The thrust blocks have not been poured against undisturbed soil but per the contractor the surrounding soil, when backfilled, will be compacted to 95%.
|
INSP-Sprinkler Rough-in | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | PASS |
Troy Cobbley
|
|
|
See the as-builts for locations where additional piping can be covered by hard lids.
|
INSP-Sprinkler Rough-in | 1/10/2012 | 1/10/2012 | 1/10/2012 | P | PASS |
Troy Cobbley
|
|
|
A revised set of as-builts were issued today with the date of 1-10-1012. These are now the set of drawings that I'm inspecting to. Anyway area "B" is now approved for cover. I went over possible future issues with Scott about wall heights at the west end of the building and that if the walls are not full height as had been stated to Tim Frost that additional hydraulic calculation areas may be need due to open spaces above the ceilings.
|
Miscellaneous action | | | 1/10/2012 | | PASS |
Tim Frost
|
|
|
2nd As Built Plan Mod #1 review. Ok
Add ells to 4" main, change end of loop branch line from 1" - 1.25", Recalculated
|
Miscellaneous action | | | 1/10/2012 | | DONE |
Tim Frost
|
|
|
Emailed contractor that the 2nd as built for plan mod #1 was ok.
|
INSP-Sprinkler Rough-in | 1/6/2012 | 1/6/2012 | 1/6/2012 | P | CANC |
Troy Cobbley
|
|
|
I notified Scott Carter that I was not comfortable continuing with the inspection due to the issues encountered during yesterdays inspection. Again the remote area in question is down to a 5% cushion due to the pipe routing changes already encountered and now there have been additional fitting added that were not shown on the as-builts of the plan modifications. Plans need to be resubmitted that shown ALL pipe routing changes and additional fittings with the accompanying matching hydraulic calculations prior to any more inspections.
|
INSP-Sprinkler Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PART |
Troy Cobbley
|
|
|
Area "B" was inspected today. The general installation is ok but the 4" main routing has been changed by the addition of four elbows. Plans need to be resubmitted with revised hydraulic calculations due to the remote area only having a 5% cushion. The earth quake bracing is not complete on the 4" main. No cover in area "B" until I can verify the E.Q. bracing.
|
INSP-Sprinkler Rough-in | 12/28/2011 | 12/29/2011 | 12/29/2011 | A | PART |
Tim Frost
|
|
|
Look at several area for cover which were all ok. I marked the areas on the as built drawings of plan mod 1. Also, verify a couple of area for upright protection that was previously denied. These area were also ok.
|
Miscellaneous action | | | 12/28/2011 | | PASS |
|
|
|
Review partial as builts. Everything is fine.
NOTE: Told Trent be cautious with any futher piping changes. Hydraulic calculation #8 is exactly at the 5% saftey margin required by the State of ID.
|
INSP-Sprinkler Rough-in | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | FAIL |
Troy Cobbley
|
|
|
Plan modifications are needed to show the actual pipe routings and pipe sizing used for the installation. I did approve cover on the east corridor that is against the outer walls as per Scott, the superintendant, and I's discussions. As agreed two areas need to be left uncovered to provide access to two additional upright heads that are needed. I also found overspaced heads in the mezzanine level on the south side as well as unbraced sprig ups that exceed 4'
|
INSP-Sprinkler Rough-in | 12/22/2011 | 12/22/2011 | 12/22/2011 | P | CANC |
Troy Cobbley
|
|
|
Miguel Phone #: ###-#### Inspection cancelled from web by: Trent Bice
|
Permit Ready to Issue | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 12/22/2011 | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told them that permit is ready & fees due on 12-22-11 @ 8:10am//BAS
|
(F) Reprint permit | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/22/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 12/21/2011 | | |
|
|
|
|
Sprinkler Plan Check | 12/21/2011 | | 12/21/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2011 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 12/14/2011 | | 12/21/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/20/2011 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Sprinkler Plan Check | 12/16/2011 | | 12/16/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/16/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 12/16/2011 | | DONE |
|
|
|
t/c w don - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 12/14/2011 | | DONE |
Christina Prado
|
|
|
PLAN MOD*** Plan Mod accepted 12/14/2011. Received one set of application; three sets of Anti-freeze calcs; three sets of Wet calcs; and three sets of plans marked 1 thru 5. Plans and apps given to Tim Frost for review
|
INSP-Sprinkler Rough-in | 12/8/2011 | 12/8/2011 | 12/8/2011 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in rooms 193, 194, 195 and 196 is ok to cover. I also spoke to Scott with Jacobsen Construction about inspections prior to covering.
|
Meeting | | | 12/7/2011 | | DONE |
Tim Frost
|
|
|
Meetng with Fire Sprinkler Contractor, Designer, Plan reviewer, and field inspector to discuss required design modifications necessary to protect combustible concealed spaces in building.
|
INSP-Conference | 12/6/2011 | 12/6/2011 | 12/6/2011 | P | DONE |
Troy Cobbley
|
|
|
I requested Tim Frost to accompany me to this project to verify possible issues with combustible concealed spaces that I had found on the previous days courtesy inspection. We found many areas which have not been provided upright sprinkler protection and when protection is provided will require many additional sprinkler heads. Per the city approved plans only pendant protection below the ceilings has been provided in these areas. I spoke to the sprinkler fitter and let him know that Plan Modifications will be required. I also spoke to Frank and Ricardo with Jacobsen Construction about a possible stop work order if any more piping is covered and the possibility of removing ceilings just to inspect what has already been installed and covered. No sprinkler rough-in inspections have been performed to this point. I notified Scott and Romeo of the situation.
|
Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
DO NOT FINAL this permit until I receive the documentation from the fire protection contractor in regards to the antifreeze system.
|
Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Sent Trent another email requesting him to fill out the enclosed antifreeze form and have the owner sign and date.
|
Issue and Print Permit | | | 11/4/2011 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/2/2011 | | 11/2/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2011 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 11/2/2011 | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/2/2011 | | DONE |
Barbara Stitt
|
|
|
Called and left message for Trent Bice that permit is ready & fees due on 11-2-11 @ 2:00PM//BAS
|
Plan assigned to (Tim) | 9/29/2011 | | 11/2/2011 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 10/28/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal documents and plans; routed to fire review.
|
Early Start | | | 10/17/2011 | | DONE |
|
|
|
See attached
|
Miscellaneous action | | | 10/14/2011 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Sprinkler Plan Check | 10/14/2011 | | 10/14/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Telephone call | | | 10/14/2011 | | DONE |
|
|
|
t/c w aaron - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 10/12/2011 | | DONE |
Christina Prado
|
|
|
Received complete set of new applications, calcs, plans and more calcs. Giving to Tim for review
|
Sprinkler Plan Check | 10/6/2011 | | 10/6/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/6/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/6/2011 | | DONE |
|
|
|
t/c w michelle - permit denied - needs to be picked up and resubmitted
|
Application received | | | 9/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
INSP-Sprinkler Rough-in | 5/3/2012 | 5/3/2012 | | P | |
Tim Frost
|
|
|
Chiller Shop rough to cover. please call when in route. Phone #: ###-#### >> Inspection requested via web by Scott Carter II
|