Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 5/7/2012 | 5/8/2012 | 5/8/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/30/2012 | 4/4/2012 | 4/4/2012 | P | CANC |
Troy Cobbley
|
|
|
To be cancelled per Stefan Phone #: ###-####
|
INSP-Final Inspection | 2/21/2012 | 2/29/2012 | 2/29/2012 | P | CANC |
Troy Cobbley
|
|
|
Stephan Hauge ###-####
|
Miscellaneous action | | | 2/15/2012 | | DONE |
|
|
|
Received as built drawings from field inspector.
|
INSP-Supply line flush | 2/3/2012 | 2/6/2012 | 2/6/2012 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed. On walking through the project I noted alot of painted sprinkler pendants that will require replacement.
|
INSP-Sprinkler Rough-in | 12/1/2011 | 12/1/2011 | 12/1/2011 | P | PASS |
Troy Cobbley
|
|
|
The tenting is complete except for the top of the riser to main feed. This will be verified later. Piping can be covered.
|
INSP-Sprinkler Rough-in | 11/15/2011 | 11/16/2011 | 11/16/2011 | A | PASS |
Troy Cobbley
|
|
|
The underground supplt piping is ok to bury
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. One pendant needs to be relocated in the Laundry room and as-builts showing the revised pipe routing are needed. The tenting still needs to be done.
|
INSP-Sprinkler Rough-in | 11/11/2011 | 11/14/2011 | 11/14/2011 | P | FAIL |
Troy Cobbley
|
|
|
The original copies of the city approved plans were not on site so no rough-in inspection was performed. Also the installation was not complete. I went over underground supply requirements with the driller and Jim the owner.
|
Issue and Print Permit | | | 10/14/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/30/2011 | | 10/6/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/6/2011 | | 10/6/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/6/2011 | | 10/6/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/6/2011 | | DONE |
|
|
|
left vm for jim - permit ready and fees given
|
Permit Ready to Issue | | | 10/6/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/4/2011 | | |
|
|
|
|
Case Summary | | | 10/4/2011 | | |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 10/3/2011 | | 10/3/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/3/2011 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/3/2011 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 10/3/2011 | | DONE |
|
|
|
t/c w tanner - permit denied - needs to be picked up and resubmitted
|
Application received | | | 9/30/2011 | | |
|
|
|
|