INSP-Final Inspection | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
INSP-Sprinkler Rough-in | 1/6/2012 | 1/9/2012 | 1/9/2012 | A | PART |
Forrest France
|
|
|
Overhead work at the storage room, coat room and entry vestibule approved for ceiling cover.
|
INSP-Sprinkler Rough-in | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PART |
Forrest France
|
|
|
Okay to cover at the banquet and food preparation rooms.
|
INSP-Sprinkler Rough-in | 11/9/2011 | 11/10/2011 | 11/10/2011 | A | PASS |
Troy Cobbley
|
|
|
The piping above the soffit areas is ok to cover.
|
INSP-Sprinkler Rough-in | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
INSP-Sprinkler Rough-in | 11/8/2011 | 11/9/2011 | 11/9/2011 | A | NR |
Forrest France
|
|
|
Rescheduled by contractor for PM.
|
Issue and Print Permit | | | 10/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/6/2011 | | 10/7/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/7/2011 | | 10/7/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/7/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
|
|
|
t/c w brodie - permit denied - needs to be picked up and resubmitted
|
Sprinkler Plan Check | 10/7/2011 | | 10/7/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/7/2011 | | 10/7/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 10/7/2011 | | DONE |
|
|
|
|
Application received | | | 10/6/2011 | | |
|
|
|
|
Pending Assignment by SAM | 10/6/2011 | | 10/6/2011 | | DONE |
Patricia Smith
|
|
|
|