Miscellaneous action | | | 4/12/2012 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 2/27/2012 | 2/28/2012 | 2/28/2012 | A | PASS |
Forrest France
|
|
|
Verified installation of the knox box and reciept of record of completion documents. Noted phone line one trouble condition on the panel at the time of inspection- tech in route to repair per conversation with tenant.
|
INSP-Final Inspection | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide knox box and correct record of completion forms.
|
INSP-Final Inspection | 12/6/2011 | 12/9/2011 | 12/9/2011 | A | FAIL |
Troy Cobbley
|
|
|
No actual testing of devices was performed due to no approved plans/notes on site. I noted one strobe overspaced and that two manual pull stations had been added at two exterior doors. As-builts are required prior to a final sign off.
|
Issue and Print Permit | | | 11/2/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 10/11/2011 | | 10/13/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 10/13/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 10/13/2011 | | 10/13/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 10/13/2011 | | DONE |
|
|
|
Approved plans available at front counter.
|
Miscellaneous action | | | 10/13/2011 | | DONE |
|
|
|
Received two sets of replacement drawings and calculations due to architectural changes to the plans.
|
Inspection Record Card- Fire | 10/13/2011 | | 10/13/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/13/2011 | | DONE |
|
|
|
left vm for scott - permit ready and fees given
|
Permit Ready to Issue | | | 10/13/2011 | | DONE |
|
|
|
|
Application received | | | 10/11/2011 | | |
|
|
|
|