Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/27/2011 | 12/28/2011 | 12/28/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Forrest France
|
|
|
|
INSP-Final Inspection | 12/22/2011 | 12/22/2011 | 12/22/2011 | P | PART |
Forrest France
|
|
|
Verified correction items, completed forward flow, final pending control valve tampers.
|
INSP-Final Inspection | 12/13/2011 | 12/14/2011 | 12/14/2011 | P | NR |
Forrest France
|
|
|
Charles is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/14/2011 | 12/14/2011 | 12/14/2011 | A | FAIL |
Forrest France
|
|
|
Noted items include #3, 5 and 7 on the fire code review comments regarding seismic brace attatchments to Z purlins, trapeeze calculations, and supervised tamper control vavles at the new DCVA. Also noted missing lateral branch line restraints per NFPA 13 2010 9.3.6.4 and plan detail. The compressor room appears inadequately heated.
|
INSP-Sprinkler Rough-in/Hydro | 12/13/2011 | 12/14/2011 | 12/14/2011 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed after temp. bypass of the PRV.
|
Issue and Print Permit | | | 11/8/2011 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/7/2011 | | 11/7/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/7/2011 | | 11/7/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/7/2011 | | DONE |
|
|
|
t/c w shaun - permit ready and fees given
|
Permit Ready to Issue | | | 11/7/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/18/2011 | | 11/7/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 11/4/2011 | | DONE |
|
|
|
t/c w shaun - permit denied - needs to be picked up and resubmitted
|
Plan resubmittals received | | | 11/1/2011 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal folder and plans; routed to Fire Review.
|
Sprinkler Plan Check | 10/20/2011 | | 10/20/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/20/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/20/2011 | | DONE |
|
|
|
t/c w shaun - permit denied - needs to be picked up and resubmitted
|
Application received | | | 10/18/2011 | | |
|
|
|
|
Case Summary | | | 10/18/2011 | | |
|
|
|
|