Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00571
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 5200 S FEDERAL WAY
Project NameNashua Addition
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of addition to an existing building. In addition, a portion of the roof will be raised. A new backflow preventer is being added. The system utilizes ELO sprinklers. The new portion and the portion with the raise roof is a compound grid. The existing portion is a standard grid. Both grids are interconnected as one system. The existing underground is 8” The riser and new backflow preventer is 8”. The branch piping is 2” and the mains are 6”, 5” and 4”. The system is based on extra hazard group II. The building is premanufacture of Z purlin construction.


Building Department Scope:

Nashua Manufacturing Building Addition - To construct a new 9,160 square foot, one, story manufacturing building addition at the northeast corner of an existing 26,265 square foot manufacturing building. The building addition and existing building are pre-engineered metal buildings. This permit also includes related site improvements. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/24/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection12/27/201112/28/201112/28/2011APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection12/23/201112/23/201112/23/2011PPART
DetailsForrest France
INSP-Final Inspection12/22/201112/22/201112/22/2011PPART
DetailsForrest France
Verified correction items, completed forward flow, final pending control valve tampers.
INSP-Final Inspection12/13/201112/14/201112/14/2011PNR
DetailsForrest France
Charles is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/14/201112/14/201112/14/2011AFAIL
DetailsForrest France
Noted items include #3, 5 and 7 on the fire code review comments regarding seismic brace attatchments to Z purlins, trapeeze calculations, and supervised tamper control vavles at the new DCVA. Also noted missing lateral branch line restraints per NFPA 13 2010 9.3.6.4 and plan detail. The compressor room appears inadequately heated.
INSP-Sprinkler Rough-in/Hydro12/13/201112/14/201112/14/2011PPART
DetailsForrest France
Overhead hydrostatic test passed after temp. bypass of the PRV.
Issue and Print Permit  11/8/2011 DONE
Sprinkler Plan Check11/7/2011 11/7/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  11/7/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire11/7/2011 11/7/2011 DONE
DetailsPatricia Smith
Telephone call  11/7/2011 DONE
t/c w shaun - permit ready and fees given
Permit Ready to Issue  11/7/2011 DONE
Details
Plan assigned to (Tim)10/18/2011 11/7/2011 DONE
DetailsTim Frost
Telephone call  11/4/2011 DONE
t/c w shaun - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  11/1/2011 DONE
DetailsTisha Gallop
received three copies of application, submittal folder and plans; routed to Fire Review.
Sprinkler Plan Check10/20/2011 10/20/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  10/20/2011 DONE
DetailsTim Frost
Telephone call  10/20/2011 DONE
t/c w shaun - permit denied - needs to be picked up and resubmitted
Application received  10/18/2011  
Case Summary  10/18/2011