Miscellaneous action | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2012 | 2/28/2012 | 2/28/2012 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 12/6/2011 | 12/6/2011 | 12/7/2011 | P | PART |
Forrest France
|
|
|
UG fire supply line including the IBR okayed for bury. Seismic clearance to be provided at the riser stub/floor slab.
|
Plan assigned to (Tim) | 10/20/2011 | | 10/21/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/21/2011 | | 10/21/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/21/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2011 | | DONE |
Tim Frost
|
|
|
|
Override - Parcel Holds | | | 10/21/2011 | | |
|
|
|
|
Inspection Record Card- Fire | 10/21/2011 | | 10/21/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/21/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Override - Parcel Holds | | | 10/21/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 10/21/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/21/2011 | | |
|
|
|
|
Issue and Print Permit | | | 10/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 10/20/2011 | | DONE |
Barbara Stitt
|
|
|
|