INSP-Final Inspection | 12/20/2011 | 12/21/2011 | 12/21/2011 | A | PASS |
Forrest France
|
|
|
Final walkthrough completed satisfactory. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/22/2011 | 11/22/2011 | 11/22/2011 | A | PART |
Forrest France
|
|
|
Overhead cover approved.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2011 | 11/9/2011 | 11/9/2011 | P | PART |
Forrest France
|
|
|
Overhead rough-in inspection passed, okayed for cover. Note: a min. 8" lintel at the shower enclosure to be provided or install pendent head per plan. Hydrostatic testing also completed. Fixture obstructions not verified.
|
Plan assigned to (Tim) | 11/4/2011 | | 11/7/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/7/2011 | | 11/7/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/7/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/7/2011 | | 11/7/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/7/2011 | | DONE |
|
|
|
t/c w jeff - permit ready and fees given
|
Permit Ready to Issue | | | 11/7/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/7/2011 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 11/4/2011 | | |
|
|
|
|
Pending Assignment by SAM | 11/4/2011 | | 11/4/2011 | | DONE |
Patricia Smith
|
|
|
|