Miscellaneous action | | | 9/27/2012 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 6/25/2012 | 6/28/2012 | 6/28/2012 | A | PASS |
Forrest France
|
|
|
Completed fire alarm permit work acceptance test. Adjustments finished while on site.
|
INSP-Final Inspection | 6/25/2012 | 6/27/2012 | 6/25/2012 | A | CANC |
Forrest France
|
|
|
We would like to meet you for an inspection at 7am if possible. Protex is the Fire Alarm Vendor their number is ###-#### (Rob Athen Cell) or office is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
FIR-Aging Inspection | 6/21/2012 | 6/21/2012 | 6/21/2012 | | DONE |
Forrest France
|
|
|
Work in progress, construction and finishes underway.
|
INSP-Alarm Testing | 2/16/2012 | 2/16/2012 | 2/16/2012 | A | PART |
Forrest France
|
|
|
Regarding occupant notification at the blood draw area.
|
Issue and Print Permit | | | 12/5/2011 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/22/2011 | | 11/22/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/22/2011 | | DONE |
|
|
|
t/c w mike - permit ready and fees given
|
Permit Ready to Issue | | | 11/22/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 11/21/2011 | | 11/21/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/21/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Plan assigned to (Stephanie) | 11/10/2011 | | 11/21/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 11/17/2011 | | DONE |
|
|
|
Left a message for the fire alarm vendor and the designer regarding major discrepencies between the submittals and the record drawings found in onbase under FIR99-00030.
|
Telephone call | | | 11/17/2011 | | DONE |
|
|
|
Spoke to Jared Miller at DC Engineering regarding the discrepencies between the record drawings and the recently submitted drawings as well as questions about the new smoke detectors being added (i.e. their purpose). He stated that he was not the designer of record but would get the information to the right person and have him/her call me. I emailed Jared the pdf files of the record drawings from FIR99-00030 (obtained from on-base)
|
Telephone call | | | 11/17/2011 | | DONE |
|
|
|
Rob A. with Protex returned my call to go over the discrepencies. He said that the record drawings we have are not how the system was actually installed. He stated that the SLC is class 'B' (not 'A' as the record drawings indicate). He said they are removing the remote power supply and putting all of the notification on the main FACP. Rob also stated that, per the mechanical engineer, the duct detectors are not required, therefore they are being removed as well. Rob verified that there is only one remote annunciator panel and it will be relocated to the new vestibule/entrance. Rob did not know the intent of the non-required new smoke detectors and stated that would need to be answered by the engineer/designer.
|
Telephone call | | | 11/17/2011 | | DONE |
|
|
|
Spoke with Rick at DC Engineering who verified what the vendor stated regarding the class A vs class B circuiting, removing the remote power supply, and only one remote annunciator panel. He stated that the smoke detectors were placed due to the IFC requirement in 907.2.2.1 for ambulatory health care facilities. I let him know that the building does qualify for the exception that states the automatic detection is not required if the building is equiped throughout with a sprinkler system. I let him know that if he would like to take the exception I could just make it a note on the plans and get them approved. However, if he chooses to keep the detection, I went over several areas that do not have adequate smoke detection coverage and let him know that I would then need to deny the plans and await a resubmittal providing additional devices and coverage. He said he would try to get back to me later today on a decision.
|
Plan resubmittals received | | | 11/15/2011 | | DONE |
Tisha Gallop
|
|
|
received application and two copies of submittal folder and plans; routed to Fire Review.
|
1st review completed | | | 11/14/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 11/14/2011 | | 11/14/2011 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - walls are missing and cannot verify spacing of devices.
|
Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Review comments faxed to the applicant.
|
Telephone call | | | 11/14/2011 | | DONE |
|
|
|
Called Rob to let him know the plans were being denied.
|
Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Denied plans available at front counter for contractor to pick up.
|
Application received | | | 11/10/2011 | | |
|
|
|
|