INSP-Final Inspection | 2/19/2012 | 2/21/2012 | 2/21/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The ceiling tile in the adjoining space was being installed.
|
INSP-Sprinkler Rough-in/Hydro | 2/15/2012 | 2/15/2012 | 2/16/2012 | P | PART |
Forrest France
|
|
|
Overhead inspection for cover passed. SW head at the west side entry and additional pendent opposite the new demising wall can be verified at final.
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2012 | 2/10/2012 | 2/9/2012 | P | CANC |
Forrest France
|
|
|
call 30 minutes prior to arival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
Issue and Print Permit | | | 11/22/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/15/2011 | | 11/17/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/17/2011 | | 11/17/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/17/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/17/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/17/2011 | | 11/17/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/17/2011 | | DONE |
|
|
|
t/c w sam - permit ready and fees given
|
Permit Ready to Issue | | | 11/17/2011 | | DONE |
|
|
|
|
Application received | | | 11/15/2011 | | |
|
|
|
|