Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing per NFPA 25 component replacement action table completed satisfactory.
|
INSP-Conference | 12/2/2011 | 12/2/2011 | 12/2/2011 | P | DONE |
Forrest France
|
|
|
Regarding quick response heads throughout the 3rd floor.
|
INSP-Sprinkler Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PART |
Forrest France
|
|
|
Overhead work at the remodel area approved for ceiling cover.
|
Plan assigned to (Tim) | 11/17/2011 | | 11/21/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/21/2011 | | 11/21/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/21/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/21/2011 | | 11/21/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/21/2011 | | DONE |
|
|
|
t/c w brad - permit ready and fees given
|
Permit Ready to Issue | | | 11/21/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/21/2011 | | DONE |
|
|
|
|
Application received | | | 11/17/2011 | | |
|
|
|
|