Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled. Trip test and riser monitoring passed inspection.
|
INSP-Final Inspection | 2/29/2012 | 3/1/2012 | 2/29/2012 | A | CANC |
Troy Cobbley
|
|
|
Tom is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 2/27/2012 | 2/29/2012 | 2/29/2012 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in | 2/24/2012 | 2/27/2012 | 2/27/2012 | A | PART |
Forrest France
|
|
|
Overhead work at the grid ceiling areas throughout are approved for cover. Noted semi-recessed heads at rooms with sheetrock ceilings and surface mounted light fixtures to meet obstruction criteria per NFPA 13 guidelines as discussed.
|
INSP-Sprinkler Rough-in | 2/21/2012 | 2/22/2012 | 2/22/2012 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test passed
|
INSP-Sprinkler Rough-in | 2/21/2012 | 2/21/2012 | 2/21/2012 | P | PART |
Troy Cobbley
|
|
|
This is for a 24 hr air test. Test was started at 11:00 with 43 psi on the guage. I asked Tom to schedule the follow up for tomorrow.
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2012 | 2/3/2012 | 2/3/2012 | P | PASS |
Troy Cobbley
|
|
|
hydro test passed
|
INSP-Sprinkler Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Office area piping is not yet complete. Also still need the hydro tests and air test of the dry system.
|
INSP-Sprinkler Rough-in | 1/2/2012 | 1/3/2012 | 1/3/2012 | A | FAIL |
Troy Cobbley
|
|
|
No real inspection could be performed due to the Job Site Copy of the plans not being on the job site. I did however give permission to cover the sprinkler piping in four restrooms and one office.
|
Issue and Print Permit | | | 12/5/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/30/2011 | | 12/2/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/2/2011 | | 12/2/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 12/2/2011 | | 12/2/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 12/2/2011 | | DONE |
|
|
|
t/c w meloday - permit ready and fees given
|
Permit Ready to Issue | | | 12/2/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/30/2011 | | DONE |
Christina Prado
|
|
|
Received three sets of new plans, applications and checklist. Routed to Tim Frost for review
|
Plan assigned to (Tim) | 11/23/2011 | | 11/28/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/28/2011 | | 11/28/2011 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/28/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2011 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 11/28/2011 | | DONE |
|
|
|
t/c w melody - permit denied - needs to be picked up and resubmitted
|
Application received | | | 11/23/2011 | | DONE |
Barbara Stitt
|
|
|
|