Miscellaneous action | | | 4/24/2012 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 3/21/2012 | 3/22/2012 | 3/22/2012 | A | PASS |
Forrest France
|
|
|
Final inspection passed. Signature card not available on site, permit finaled.
|
INSP-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 | P | PART |
Forrest France
|
|
|
Verified tie-in to the existing system, approved for ceiling cover at this location.
|
INSP-Sprinkler Rough-in | 1/3/2012 | 1/3/2012 | 1/3/2012 | P | PART |
Forrest France
|
|
|
Regarding system tie-in location.
|
INSP-Sprinkler Rough-in | 12/16/2011 | 12/16/2011 | 12/16/2011 | P | PART |
Forrest France
|
|
|
Field verified insulation at wet system piping for cold cavity protection, cover approved. Need to verify system tie-in when complete.
|
INSP-Sprinkler Rough-in | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | PART |
Forrest France
|
|
|
Overhead rough-in insp. passed. Per contractor wall at the shower enclosure is not full height.
|
Sprinkler Plan Check | 11/29/2011 | | 11/29/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/29/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/29/2011 | | 11/29/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 11/29/2011 | | DONE |
|
|
|
left message for jon - permit ready and fees given
|
Permit Ready to Issue | | | 11/29/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/29/2011 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary | | | 11/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 11/28/2011 | | |
|
|
|
|
Pending Assignment by SAM | 11/28/2011 | | | | |
|
|
|
|