INSP-Final Inspection | 2/6/2012 | 2/6/2012 | 2/6/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 1/19/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 1/19/2012 | 1/19/2012 | 1/20/2012 | P | DEFR |
Forrest France
|
|
|
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/10/2012 | 1/11/2012 | 1/11/2012 | A | CANC |
Troy Cobbley
|
|
|
Could not perform inspection due to tile flooring being installed. John is going to reschedule. I did note one area where insulation is blocking upright sprinkler protection.
|
Issue and Print Permit | | | 12/5/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 11/30/2011 | | 12/1/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/1/2011 | | 12/1/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/1/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2011 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 12/1/2011 | | 12/1/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/1/2011 | | DONE |
Barbara Stitt
|
|
|
Called Broadie and told him that permit is ready & fees due on 12-1-11 @ 10:35am//BAS
|
Application received | | | 11/30/2011 | | |
|
|
|
|
Pending Assignment by SAM | 11/30/2011 | | 11/30/2011 | | DONE |
Patricia Smith
|
|
|
|