Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PASS |
Forrest France
|
|
|
Field verified as-built drawings. Permit finaled.
|
INSP-Final Inspection | 10/22/2012 | 10/22/2012 | 10/30/2012 | P | PEND |
Forrest France
|
|
|
Provide as-built plans for changes to system 11 including added heads below ductwork, added branchline, additional uprights in both stairways.
|
INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 | A | PART |
Forrest France
|
|
|
Final walkthrough completed acceptable for system 6 included in this permit.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2012 | 7/20/2012 | 7/23/2012 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2012 | 7/23/2012 | 7/23/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in inspection completed. Noted six additional heads below ductwork, one added head in each stairway, one extra branchline below a soffit.
|
INSP-Sprinkler Rough-in/Hydro | 7/2/2012 | 7/3/2012 | 7/5/2012 | P | PART |
Forrest France
|
|
|
System 6 overhead hydrostatic test and rough-in inspection completed satisfactory.
|
FIR-Aging Inspection | 6/8/2012 | 6/8/2012 | 6/8/2012 | | PEND |
Forrest France
|
|
|
Construction underway.
|
Fees Due Hold | 1/7/2012 | | 1/30/2012 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 12/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 12/7/2011 | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/7/2011 | | DONE |
Barbara Stitt
|
|
|
E-mailed Paul Marcolina and informed him that permit is ready & fees due on 12-7-11 @ 8:45am//BAS
|
Plan assigned to (Tim) | 12/5/2011 | | 12/6/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/6/2011 | | 12/6/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/6/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/6/2011 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/5/2011 | | |
|
|
|
|