Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR11-00657
StatusFinaled
Name R M E INC
Site Address 805 W IDAHO ST Unit: 202
Project NameTHE CAPROCK GROUP
Customer Number 
ePlanReviewNo
Description
This quick permit is to provide notification to accomodate a tenant improvement. New notification devices are being added to an existing NAC panel. Initiating devices are not part of this scope of work. Approval is subject to field measurement of the EOL voltage drop. For appliances with an operating voltage range of 16V – 33V, the minimum acceptable voltage is 19.6V with the AC power off. Any measurement below this voltage will be considered insufficient to run the NACs at the end of useful battery life of 20.4V. UL 864, Standard for Control Units for Fire Signaling Systems. The installing contractor shall have available at final inspection a voltage meter and measure end of line voltages; witnessed by the field inspector. There are no written review comments. Associated building permit: BLD11-02884 (THE CAPROCK GROUP – Boise City National Bank Bldg – Ste # 202) Permit is to remodel an existing 1,778 square foot tenant space on the second floor of a Historic Building. This building is fully fire sprinklered for substitute for one hour construction for the existing portions of the building. Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior nonbearing walls to create additional offices, a break room, storage rooms, and to infill existing openings], installation of new accessible doors and hardware, new lighting, installation of plumbing, and interior finishes in compliance with Ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/20/2012 DONE
Plans taken to records for scanning.
INSP-Final Inspection1/6/20121/9/20121/9/2012APASS
DetailsForrest France
Inspection passed. Fire alarm permit finaled.
Issue and Print Permit  12/29/2011 DONE
Plan assigned to (Stephanie)12/12/2011 12/15/2011 DONE
DetailsStephanie L. Cobbley
Plan assigned to (Stephanie)12/12/2011 12/15/2011 DONE
DetailsStephanie L. Cobbley
Telephone call  12/15/2011 DONE
Spoke to Rob Ahten w/ Protex and requested the battery calculations and voltage drops. He said he would get them to me later today.
1st review completed  12/15/2011 DONE
Miscellaneous action  12/15/2011 DONE
Received requested information.
Alarm Plan Check12/15/2011 12/15/2011 PASS
DetailsStephanie L. Cobbley
Quick permit plans approved - no written review comments.
PLANS TAKEN FRONT DESK ALARM  12/15/2011 DONE
Approved quick permit plans available at front counter.
Inspection Record Card- Fire12/15/2011 12/15/2011 DONE
DetailsPatricia Smith
Telephone call  12/15/2011 DONE
left vm for tyler - permit ready and fees given
Permit Ready to Issue  12/15/2011 DONE
Details
Application received  12/12/2011