Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR11-00659
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 25 Deluge Water C
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of providing a 6 nozzle deluge water curtain to protect opening in a 3 hour wall. The design is somewhat based on FM data sheet 1-23. The detection is from cross-zoned smoke and heat detector. There are two systems. The other side of the wall is in a different permit. The system will actuate on the opposite of the wall of where the detectors have initiated. The design has been reviewed by both the Fire Marshal and Building Official.


Building Department Scope:

Micron Buildings 24D & 24E - (C15141) - Remodel For Clean and Dirty Links - To convert approximately 1,900 sq. ft. of clean link, dirty corridor, and dock space in Building 24D into a clean link to future Building 50. Install new cleanroom ceiling grid with HEPAS to prepare for installation of AMHS extension to Building 50. Remodel approximately 1,200 sq. ft. of Lab space in Building 24E to accommodate a new dirty corridor to Building 50. Install new catwalks in the interstial spaces of Buildings 24D & 24E to accommodate facility routing in the area. This work is being done on the first floor of Buildings 24D & 24E between grid lines A&F and 30&33. This permit also includes related electrical and mechanical work. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection4/23/20124/23/20124/23/2012PPASS
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro2/28/20122/29/20123/1/2012APART
DetailsForrest France
Overhead hydrostatic test and rough-in inspection completed acceptable.
INSP-Sprinkler Rough-in/Hydro2/24/20122/24/20122/24/2012PDEFR
DetailsForrest France
Intended for hydrostatic testing of the new system supply main.
Issue and Print Permit  12/16/2011 DONE
Plan assigned to (Tim)12/12/2011 12/15/2011 DONE
DetailsTim Frost
Sprinkler Plan Check12/15/2011 12/15/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  12/15/2011 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  12/15/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire12/15/2011 12/15/2011 DONE
DetailsPatricia Smith
Telephone call  12/15/2011 DONE
left vm for karyn - permit ready and fees given
Permit Ready to Issue  12/15/2011 DONE
Details
Telephone call  12/14/2011 PEND
Spoke with Colin and asked him to send manufacture literature on the strainer. Project is on hold pending this information.
Application received  12/12/2011